BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 29, 2022 at 8:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Umatilla, Oregon. Contact the soliciting agency for additional information.

Award Details Contract Award Date: Aug 19, 2022 Contract Award Number: W912EF22P0050 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: Y4CBP2VLNQC7 Contractor Awarded Name: YOY INC Contractor Awarded Address: Coeur D Alene, ID 83815-8395 USA Base and All Options Value (Total Contract Value): $64303.00 SCOPE OF WORK It is the intent of the US Army Corps of Engineers to award a contract to have ONE (1) 4A VBS Hatch Cover assembly, Mounting Hardware, and Support Beam supplied to McNary Dam. FABRICATION OF VBS HATCH COVER ASSEMBLY The Contractor shall manufacture ONE (1) 4A Hatch Cover assembly. VBS Hatch Cover Manufacturing Manufacture ONE (1) hatch cover per drawings S-401. All concrete shall meet specifications 03 40 00.00 28 PRECAST CONCRETE. All steel shall meet specifications 05 05 23.00 28 STRUCTURAL STEEL, METALWORK FABRICATION, AND WELDING. VBS Structural Support Assembly Manufacture ONE (1) hatch cover support assembly per drawing S-402 All steel shall meet specifications 05 05 23.00 28 STRUCTURAL STEEL, METALWORK FABRICATION, AND WELDING. VBS Hardware package Supply ONE (1) set of any hardware needed for the VBS hatch cover and structural support assembly. All hardware shall meet specifications 03 40 00.00 28 PRECAST CONCRETE. All hardware shall meet specifications 05 05 23.00 28 STRUCTURAL STEEL, METALWORK FABRICATION, AND WELDING. 3.0 SUBMTTTALS After acceptance, submittals must include approval drawings for tooling fabrication and seal assembly. NOTE: The Government Technical Point of Contact for this requirement is Mr. Michael Timm. He can be reached at (541) 922-1347 or email to Michael.b.timm@usace.army.mil. Mr. Timm will conduct a site visit during production of the hatch cover to ensure the cover and all accessories meet our technical specifications and all requirements therein. SHIPMENT AND DELIVERY The seal assemblies shall be delivered as FOB Destination. The Contractor shall be responsible for packing and shipping the components in a manner that will ensure undamaged and complete arrival to McNary Lock and Dam. Delivery of all components shall be within FOURTEEN (14) weeks of award of contract. Shipments are only allowed during normal business hours of Monday - Thursday 7:00am to 4:00pm. All shipments shall be delivered to: McNary Lock and Dam 82790 Devore Rd. Umatilla, OR 97882 The method of contractor selection has not been determined at this time.

Award

Water / Sewer

$64,303.00

Public - Federal

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
18
Bidding Soon
343
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 2, 2022

September 2, 2022

Project location map

To Be Determined, Umatilla, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.