BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of a water / sewer project in Binghamton, New York. Completed plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.

It is the Contractors responsibility to meet the minimum guidelines of the Occupational Safety and Health Act (O.S.H.A.), in particular Part 1926, the Safety and Health Regulations for Construction. The Town of Fenton has the authority to issue a Stop Work Order if the applicable O.S.H.A. regulations are violated. The Stop Work Order will remain in effect until such violations of the O.S.H.A regulations have been rectified. . No proposal will be considered unless it is accompanied by a bid guaranty which shall not be less than ten percent (10%) of the amount bid for the total work contemplated to be done. At the option of the Bidder, the guaranty may be a certified check, bank draft, or a bid bond approved by the Town Attorney. Certified check or bank draft must be payable to the order of the Town of Fenton. Cash deposits will not be accepted. The Bid guaranty shall insure the execution of the Agreement and the furnishing of the surety bond or bonds by the successful Bidder, all as required by the Contract Documents. Bidders submitting bid proposals for this work hereby acknowledge the following: Each laborer, workman, or mechanic employed by the Contractor, Subcontractor, or other person about or upon the work under this Contract, shall be paid not less than the prevailing rate of wages, and shall be paid for or provided the supplements not less than the prevailing supplements as determined by the New York State Department of Labor, pursuant to Article 8 of the New York State Labor Law. The prevailing rate schedule, as determined by the New York State Department of Labor (PRC# 2022002881 Nowlan Road Water Tank Replacement), is a part of this Contract, and can be obtained at the following website. The Contractor shall submit a certified copy of all payrolls with each payment requisition to the Town of Fenton. The prime Contractor shall be responsible for the submission of copies of payrolls of all Subcontractors. The Bidder agrees that this bid shall be good and may not be withdrawn for a period of 30 calendar days after the scheduled closing time for receiving bids. The Town will award the bid within 30 days after the scheduled closing time for receiving bids. The Town reserves the right to reject any and all bids and to award the Contract in the best interests of the Town of Fenton, New York.

Award

Water / Sewer

$1,128,000.00

Public - City

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
64
Bidding Soon
845
All Active Projects
429
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 22, 2022

August 15, 2022

img_map_placeholder

Nowlan Rd, Binghamton, NY


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.