BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 25, 2022 at 8:00 PM

Updated September 15, 2023

Site work and paving for a mixed-use development in Lynnwood, Washington. Completed plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The .65-acre park site work includes, but not limited to a new concrete plaza, paver plaza, and walking paths, concrete retaining wall and seatwalls, footing/foundation for the Gold Star Families Memorial Monument, minor drainage, electrical conduit, site grading, soil preparation, channelization, permanent signing, and installation of City-purchased site furnishings Engineer's Estimate: $274,403 to $320,137 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Time for Completion: Project must be complete or substantially complete by November 1, 2022. Small diverse businesses are encouraged to participate in this project. PN - 21-064

Award

Playgrounds / Parks / Athletic Fields

$353,918.00

Public - City

Paving, Site Work

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
198
Active Projects
105
Bidding Soon
1,801
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 14, 2022

July 14, 2022

Project location map

194th St SW & 44th Ave W, Lynnwood, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.