Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Dinosaur, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.
PROJECT DESCRIPTION: The Central Federal Lands Highway Division (CFLHD) of the Federal Highway Administration (FHWA), in cooperation with the National Park Service (NPS) is proposing to rehabilitate (3R) the pavement and curb conditions for Harpers Corner Road within the Dinosaur National Monument. The project is located in Moffat County near Dinosaur, CO and will consist of rehabilitating approximately 14 miles of the road and one (1) parking area. Harpers Corner Road needs rehabilitation due to deterioration that is typical of aging pavements and due to several subgrade failures. SCOPE OF THE WORK: The project scope is rehabilitation of existing roads, pullouts and parking areas so that visitors can continue to safely access park destinations. The existing pavement along Harpers Corner Road is generally in moderate condition with several moderate to high severity subgrade failures. The existing posted speed along the route is 45 mph. This roadway is classified as an NPS Class 1 roadway; a principal park road/rural parkway with one lane in each direction. The existing roadway is paved and varies from 22 to 30 feet in width along the entire 14 miles with an approximate 2% normal crown and superelevation and corner widening, as needed on curves. Existing drainage is adequate with the exception of one subgrade failure where a new culvert is proposed. The asphalt curb and gutter is completely buried in several locations and overrun with vegetation and debris on others. Guardrail is generally in good condition but will be replaced to be meet current MASH requirements. The project will be split into a base schedule encompassing 4.33 miles, and 2 options, encompassing 2.73 miles and 7.06 miles. It will require minor widening where the existing width is less than 24 feet, as well as the addition of minor drainage improvements and concrete curbs. Improvements also include embankment, full-depth reclamation, asphalt concrete pavement, guardrail, concrete curb, culverts, gates, ADA improvements, pavement markings and subexcavation. The project will be constructed under temporary single lane closures requiring temporary traffic control. All work occurs within environmentally sensitive settings which will require best management practices and restrictions to protect identified resources. ESTIMATED COST RANGE: The project is between $10,000,000 and $20,000,000. TECHNICAL QUESTIONS REGARDING THIS SOLICITATION WILL NOT BE ACCEPTED AFTER 4 P.M. ON DECEMBER 08, 2022 Questions can be submitted to CFLContracts@dot.gov. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Bid Results
Roads / Highways
$16,894,674.00
Public - Federal
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 15, 2022
February 13, 2023
Harpers Corner Rd, Dinosaur, CO
Related To This Project
Dinosaur, CO
Bid Date: Feb 10 2021
Dinosaur, CO
Bid Date: Nov 21 2024
Woodland Park, CO
Bid Date: Dec 20 2022
Westminster, CO
Bid Date: Dec 21 2022
Loveland, CO
Bid Date: Dec 15 2022
Pueblo, CO
Bid Date: Nov 30 2022
Pueblo, CO
--
Calhan, CO
Bid Date: Dec 01 2022
Ignacio, CO
Bid Date: Nov 22 2022
Avon, CO
Bid Date: Jan 24 2023
Thornton, CO
Bid Date: Nov 30 2022
Denver, CO
Bid Date: Nov 24 2022
Salida, CO
Bid Date: Jan 12 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.