BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a pre-engineered storage facility in Killdeer, North Dakota. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Dunn County that the Dunn County Board of County Commissioners will receive and open sealed bids for 60'x60'x16' salt shed building. Building location is 2271 High St SE, Killdeer ND The building must be built to the following specs including parts, labor, permits and fees: Labor-100% cost to finish entire 60'x60'x16' high Salt shed building. Includes the following: Setting all poles in concrete. All framing of exterior walls and roof framing. Installing all 26 gauge Exterior Tin and Trim. Installing treated bridge plank on the inside 4 foot up. Installing 2x6 wall purling's on the inside of the poles to fasten 1/2'' plywood sheathing on to them for sheer strength Installing 2x4 purling's on the inside ceiling to attach 1/2'' plywood sheathing on the ceiling for sheer strength. Material -100% cost to fi nish entire 60'x60'x16' high Salt shed building. I n c l u d e s t h e f o l l o w i n g : 8x8 poles 4 foot on center will be used on all 3 sides of the building. Poles will be cemented by drilling 48 18'' Holes and using Sono Tubes pouring concrete around the perimeter of the poles 4 feet deep. Poles will be wrapped with a barrier that is embedded in the concrete 3 rows of 2x6 treated Tongue and Groove boards on the bottom exterior wall. 2x6 purling's 2 foot on center on the interior and exterior sidewalls. 1/2'' plywood on the interior sidewalls and ceiling. 4/12 pitch rafters with 2/12 pitch vault on the inside 4 foot on center with 2x4 purling's 2 foot on center on the roof and ceiling. Vapor/water proof membrane underneath the roof tin to prevent the roof from sweating. No Overhang on the roof trusses. 2x6 ribbon around the roof line to trim it out and to install the gutters on Install 120 lineal feet of 6'' seamless gutters. 4 sets of 3x4 sown spouts. Exterior walls and roof will have 26 Gauge Tin/Trim. 3'' x 12'' Treated bridge planking inside of walls 4 foot up to hold Salt/Sand up against it to support the walls and to prevent it from damaging the tin. All permits and fees including permitting through the city of Killdeer. Fees for the blueprints required by the city for permitting. All inspections required to fi nalize the job.

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$157,491.00

Public - County

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
4
Bidding Soon
52
All Active Projects
17
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2022

July 1, 2022

img_map_placeholder

2271 High St SE, Killdeer, ND

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.