EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 24, 2022 at 8:00 PM

Updated September 14, 2023

Site work and new construction of a transportation facility in Demopolis, Alabama. Completed plans call for the construction of a transportation facility; and for site work for a transportation facility.

The Work includes the following principal items: New Terminal Building Due to the importance of all bidders having a clear understanding of the scope and requirements for this contract, it is recommended that bidders attend this meeting. Any changes that may be agreed upon as a result of this meeting will be noted in an addendum sent to all plan holders. Total Contract Time for completion of the work is two hundred forty (240) calendar days. Liquidated damages for delay will be in the amount of $500.00 per calendar day that the project remains incomplete after the specified completion time Bid Security: Each BIDDER must deposit with his BID, as Bid Security, a Bid Bond payable to the OWNER in an amount equal to five (5) percent of the total amount Bid, but in no case more than $10,000.00. Contract Security: The Successful BIDDER will be required to furnish separate performance and payment bonds payable to the OWNER. Each bond shall be in an amount equal to 100% of the Contract Price as security for CONTRACTOR'S faithful performance and payment of all obligations under the Contract Documents. No BID may be withdrawn by the BIDDER within ninety (90) days after actual date of opening thereof. BIDS in the case of corporations not chartered in Alabama, must be accompanied by proper certificate evidencing that such corporation is authorized to do business in the State of Alabama. Bids are to be based upon prevailing wages in Marengo County, Alabama; and in no case are wages considered less than those predetermined by the Secretary of Labor, a schedule of which is contained in the Contract Documents. The Successful BIDDER whether a resident or nonresident shall be required to comply with all City, County and State licensing and/or permit laws. Any contract(s) awarded pursuant to this ADVERTISEMENT FOR BIDS may be funded in part by a grant from the U.S. Department of Transportation, Federal Aviation Administration. Neither the United States nor any of its departments, agencies or employees is or will be a party to this ADVERTISEMENT FOR BIDS or any resulting contract. This procurement will be subject to regulations contained in Airport and Airway Department Act of 1982, as amended. Bidders must comply with the following: (a) Presidents Executive Order No. 11246 supplemented by Department of Labor regulations regarding race, creed, color, sex or national origin; (b) Davis Bacon Act (40 USC276a-176a-7) as supplemented by Department of Labor Relations (29CFR Part 5); (c) Title VI of the Civil Rights Act of 1964 (PL 88 352); (d) Copeland "Anti Kickback Act" (19 USC 874) as supplemented by Department of Labor Regulations (29 CFR Part 3); (e) Sections 103 and 107 of the Contract Work Hours and Safety Standards Act (40 USC 327-333) as supplemented by Department of Labor Regulations (29 CFR, Part 5); and (f) 49 CFR Part 26 regarding small and minority business enterprise participation. BIDDERS must certify that they do not, and will not, maintain or provide for their employees any facilities that are segregated on a basis of race, color, creed or national origins. BIDDERS must submit with their BID an EEO Report Statement as required by 41 CFR 60-1-7 (b). The Owner reserves the right to refuse to issue a proposal form to a prospective bidder should such bidder be in default for any of the following reasons: (a) Failure to comply with any prequalification regulations of the Owner, if such regulations are cited, or otherwise included, in the proposal as a requirement for bidding. (b) Failure to pay, or satisfactorily settle, all bills due for labor and materials on former contracts in force (with the owner) at the time the owner issues the proposal to a prospective bidder. (c) Contractor default under previous contracts with the Owner. (d) Unsatisfactory work on previous contracts with the Owner. BIDS shall be on the forms included in the Bidding Documents and submitted in a sealed envelope clearly identified on the outside as follows: BID FOR CONSTRUCTION OF NEW TERMINAL BUILDING AIP PROJECT 3-1-0025-021-2022 The OWNER reserves the right to reject any and all BIDS, to waive any informalities or irregularities in the BIDS received, and to accept the BID which is deemed most favorable to the OWNER at the time and under the conditions stipulated.

Award

Transportation Terminals

$920,606.00

Public - City

New Construction, Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Project Meetings, Quality Requirements, Regulatory Requirements, Quality Assurance, Manufacturer Qualifications, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Masonry Anchors, Unit Masonry, Concrete Unit Masonry, Stone Assemblies, Manufactured Masonry, Cast Stone Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Heavy Timber, Sheathing, Underlayment, Architectural Woodwork, Architectural Wood Casework
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Exterior Insulation and Finish Systems, Roofing and Siding Panels, Metal Roof Panels, Flashing and Sheet Metal, Sheet Metal Flashing and Trim, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Flush Wood Doors, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board Assemblies, Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Storage Specialties, Lockers
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Furnishings and Accessories, Rugs and Mats, Runners, Furniture, Seating, Chairs
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, Air Outlets and Inlets, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Fan Coil Units
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks, Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Mobile Plant Equipment, General Vehicles, Maintenance Vehicles
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
35
Bidding Soon
393
All Active Projects
154
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 23, 2022

September 22, 2022

img_map_placeholder

744 Buzz Sawyer Field, Demopolis, AL

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

New Terminal Building

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.