BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a transportation facility in Blackwell, Oklahoma. Completed plans call for the renovation of a transportation facility.

As of July 28, 2022, project has not been awarded yet. No timeline of award was established. Bids will be made for replacement of one or both hangar roofs and/or to be accomplished by metal replacement or TPO retrofit. Work respecting the North Hanger located at the Blackwell-Tonkawa Airport is as follows: Proposal A – REPLACE WITH METAL ROOFS Remove 24-gauge metal R panel roof and replace with materials of like kind and quality - 8,385 SF – dispose of all removed materials in authorized landfill or other proper disposal method ? 180 LF of gable trim ? 160 LF of gutters ? 80 LF of ridge cap ? 8,385 SF of 3” vinyl faced insulation ? Remove and cover 6 corrugated skylight panels (3’ x 10’ or 180 SF) ? 2 story for main section – lower elevation on the north end of the building ? Closure strips for panel ends at rake Work respecting the South Hanger located at the Blackwell-Tonkawa Airport is as follows: ? Remove 24-gauge metal R panel roof and replace with materials of like kind and quality - 9,734 SF – dispose of all removed materials in authorized landfill or other proper disposal method ? 240 LF of gable trim ? 160 LF of gutters ? 80 LF of ridge cap ? 9,734 SF of 3” vinyl faced insulation ? Remove and cover 16 corrugated skylight panels (3’ x 10’ or 480 SF) ? 2 story – entire building ? Closure strips for panel ends at rake Proposal B – TPO RETROFIT ? Use same square footage as referenced above for North and/or South Hangar(s). ? Prep the existing roof surface as appropriate and add 1.5” EPS flute fill between the metal ribs ? Add 1” ISO insulation board as additional insulation/recovery board. ? 60 mill TPO membrane, either fully adhered or mechanically attached. ? 20-year minimum warranty ? Delete skylights on both hangars WAGES AND SALARIES. Davis-Bacon wage requirements shall not apply on this project. The Owner reserves the right to withhold the award of the contract for forty-five (45) days from the date of opening the proposals and no award will be made until the necessary investigations are made as to the responsibility of the lowest responsible bidder. Should there be reasons why the contract cannot be awarded within the specified period, the time may be extended by mutual agreement between the OWNER and the BIDDER. Bid Result : Airport roof - North Hangar Metal - Heritage Hills Commercial - $ 60,792.00 South Hangar Metal Roof - Heritage Hills Commercial - $ 70,575.00 North Hangar TPD Roof - Heritage Hills Commercial - $ 62,132.00 South Hangar TPD Roof - Heritage Hills Commercial - $ 72,450.00

Award

Transportation Terminals

$265,949.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
54
Bidding Soon
532
All Active Projects
250
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 20, 2022

July 20, 2022

August 10, 2022

img_map_placeholder

16705 W Hubbard Rd, Blackwell, OK

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.