BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Chicago, Illinois. Completed plans call for the renovation of a educational facility.

Questions Due Date: May 31st 2022, 12:00 PM CDT.Perez ES Compressor Repair Bid Remove existing compressor and refrigerant per EPA standards in Trane chiller that currently does not operate. Furnish and install one (1) new remanufactured 200/230/460/60-3 compressor. Furnish and install one (1) new unloader.Furnish and install two (2) new compressor contactor kits.Pressure test and charge new compressor with correct refrigerant blend. Start up and test operation. Warranty on material and labor. Furnish and install [constant volume] [and] [variable volume] rooftop unit of size, type and capacity as indicated on the Drawings. Cooling capacity ratings shall be based upon test in accordance with ARI Standard 360. Units shall consist of insulated weather tight casing, compressors, air-cooled condenser coil, condenser fans, condensate drain pan, evaporator fan(s) with VFDs (vav applications), gas fired heater, return/exhaust fans with VFDs (vav applications), motors and drives, and main control panel. Unit shall be custom built to match existing roof curb dimensions, zone duct header, return opening, gas piping connection location, etc. Units that require modification to existing curb dimensions or ducts are not acceptable unless expressly stated so in design documents. Units shall also include filters, and controls as herein specified. 1. Units shall include blow-through multi deck section (2 or 3 deck as scheduled) with gas heat deck, ventilation deck (3 deck arrangement) and DX cooling in cold deck, zone dampers with actuator section, supply fan section, return fan section, condensing unit section, filter section and control dampers for outside air, exhaust air and return air. 2. Capacities, characteristics, and accessories shall be as shown and/or scheduled on drawings. 3. Units shall be factory fabricated, assembled and factory finished. 4. Motors shall not be installed above any fans. Max. operating weight shall not exceed equipment schedule weights shown on the design drawings including roof curb, if provided. Provide certified weights with submittals.

Post-Bid

Educational

$300,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
185
Active Projects
94
Bidding Soon
1,828
All Active Projects
800
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 7, 2022

July 7, 2022

img_map_placeholder

1241 W 19th St, Chicago, IL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.