BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in Belleville, Illinois. Working plans call for site work for a water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

"As per the Owner the Project has been cancelled. Editorial Content Team is actively seeking updated information" VIRTUAL PUBLIC BID OPENING Five (5) bids were received by the date/time that bids were due in response to the Invitation for Bid Solicitation W912P923B0013 for Belleville East Creek Sewer Separation project. See attached Abstract of Bids. Apparent lowest bidder is Baxmeyer Construction, Inc. However, all bids will be reviewed for responsiveness and contractor responsibility prior to determining the Awardee. The U. S. Army Corps of Engineers, St. Louis District, Wood River Levee District is seeking a firm for construction of storm and sanitary sewers, detention basins, and related work in a mostly residential neighborhood. The work generally includes furnishing labor, materials, and equipment to build about 13,100 feet of 15-inch to 72-inch storm sewer, 2,000 feet of 12-inch and 18-inch sanitary sewer, 153 storm and sanitary structures, two detention ponds, and related work including tree removal, pavement removal, concrete and asphalt pavement patching, sidewalks and ADA ramps, pavement marking, fencing, site restoration, seeding, traffic control, and material testing. COMPETITION SET-ASIDE: 100% Small Business TYPE OF PROPOSED CONTRACT: Firm Fixed Price, Sealed Bidding PERIOD OF PERFORMANCE: 36 months after date of award Questions are due 30 August 2023 10:00am CST to Contract Specialist Michelle Person, michelle.r.person@usace.army.mil *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.ESTIMATED MAGNITUDE: between $5,000,000 and $10,000,000

Final Planning

Water / Sewer

$10,604,317.00

Public - Federal

Paving, Site Work

109

14

17

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
53
Bidding Soon
797
All Active Projects
313
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 25, 2023

January 15, 2024

img_map_placeholder

To Be Determined, Belleville, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.