BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 2, 2022 at 8:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Spartanburg, South Carolina. Contact the soliciting agency for additional information.

The purpose of this request for bids is to provide compensatory stream and wetland mitigation banking credits necessary for the construction of the transportation projects in the Tyger River Watershed. The watershed covers sections of Union, Spartanburg, Newberry and Greenville counties, a priority area in natural resource conservation for South Carolina. The Watershed spans one United States Environmental Protection Agency (EPA) Level III Ecoregions: the Piedmont. SCDOT has reviewed the United States Army Corps of Engineers (USACE) Regulatory In-Lieu Fee and Bank Information Tracking System (RIBITS) for multiple private commercial mitigation banks that service the area and determined that there are no approved USACE banks in this area able to meet the estimated SCDOT credit demand. Due to the importance of all offerors having a clear understanding of the specifications and requirements of this solicitation, a conference of potential offerors will be held on the date specified on the cover page. Bring a copy of the solicitation with you. Any changes resulting from this conference will be noted in a written amendment to the solicitation. Your failure to attend will not relieve the Contractor from responsibility for estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expense to the State. The State assumes no responsibility for any conclusions or interpretations made by the Contractor based on the information made available at the conference. Nor does the State assume responsibility for any understanding reached or representation made concerning conditions which can affect the work by any of its officers or agents before the execution of this contract, unless that understanding or representation is expressly stated in this contract Questions must be received by: 08/10/2022 12:00:00 Award will be posted on 09/20/2022. Start date: 09/30/2022 End date: 09/29/2027. Dates provided are estimates only. Any resulting contract will begin on the date specified in the notice of award. he initial term of the contract will be for one (1) year with the potential for four (4) one-year renewals, for a total possible contract period of five (5) years. See clause entitled Term of Contract - Effective Date/Initial Contract Period.

Post-Bid

Water / Sewer

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
235
Active Projects
95
Bidding Soon
1,709
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 30, 2022

September 30, 2022

Project location map

Multiple Locations, Spartanburg, SC


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.