BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 27, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a water / sewer project in Bolivar, Tennessee. Conceptual plans call for site work for a water / sewer project.

The City of Bolivar Utility Department is requesting statements of qualification from engineering firms for on-going work. The Scope of the Work includes assisting with various Planning, Design, and Construction Oversight activities related to Water, Wastewater, and Stormwater improvement projects and other projects as needed. Projects will likely include funding from the American Rescue Plan Act (ARPA), and as such must comply with ARPA requirements for Project Selection, Project Eligibility, Application for Funding, Design, Bidding, Inspection, Project Management, Close Out Documentation. The consultants role will be to provide strategic recommendations, provide guidance, design, and execution of the project delivery. The consultant should also recommend opportunities to leverage ARPA funding as applicable. Required Services: Engineering (Civil, Structural, Mechanical, Electrical, Fire Protection, Plumbing), Architectural, Planning, and Land Surveying. All responses must comply with the following Qualification Based Selection criteria and not include pricing: T.C.A. 12-4-107(a) requires that design professionals for public projects in Tennessee be selected through qualifications-based selections (QBS). Responses shall address the following points in order as these will serve as the evaluation criteria, each weighted equally: 1. Firm Introduction Provide general background information on the firm, its history, services offered in-house, capabilities, staff size, and local office locations. For services not provided by the prime firm, include firm profiles for sub-consultant firms as well. 2. Relevant Experience Provide examples of relevant experience in Water, Wastewater, and Stormwater projects and other applicable local government projects. 3. Project Team Outline the assigned project team utilizing an organization chart that demonstrates lines of communication and the names and titles of the project team for all the required services. Provide a single page resume for the principal-in-charge, the project manager/lead engineer. Provide general information on additional assigned staff. The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

$300,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
65
Bidding Soon
727
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2022

Project location map

Multiple Locations, Bolivar, TN


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.