BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in North Attleboro, Massachusetts. Completed plans call for the renovation of a municipal facility.

GENERAL SCOPE OF WORK A. The Work under the Contract consists of in general but not limited to: • Remove existing EPDM Membrane & Ballast including all related flashings in its entirety (All layers of thermal insulation & Structural deck to remain) • Mechanically fasten existing tapered insulation to deck & adhere new flat stock on top of existing insulation. • Install new wood blocking at all details and perimeter to the matching height of the new insulation and per manufacturers requirements. • Fully adhere ½” Gypsum roof board in low rise foam adhesive. • Install new cast ire drain bowl assemblies • New edge metal as shown on drawings. • New Modified Bitumen System per drawings and specifications. • All work included in Contract Documents. B. Order of Work: 1. NOTE WELL: The Contractor must submit a proposed Work Schedule to the Architect and OWNER for approval. C. In addition, the work under the Contract includes: 1. Work outside the Project Site as called for in the Contract Documents and as required for the performance of the Work. 2. The restoration of any items damaged or destroyed by encroaching upon areas outside the Project Site. 3. Providing and restoring, where appropriate, all temporary facilities

Bid Results

Municipal

$466,600.00

Public - City

Renovation

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
396
Active Projects
243
Bidding Soon
2,964
All Active Projects
1,347
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 16, 2022

July 15, 2022

img_map_placeholder

275 Landry Ave, North Attleboro, MA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.