BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 6, 2022 at 8:00 PM

Updated September 15, 2023

Demolition, site work, paving and new construction of a bridge / tunnel in Boise, Idaho. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of August 2, 2022, the project has been awarded. A timeline for construction has not been confirmed. Johnson Creek Bridge Replacement, Clark Fork, Idaho - Forest Service Road #278. This Project is located on the Sandpoint Ranger District and can be accessed from Sandpoint, Idaho by taking HWY 200 east for approx. 26.3 miles and in Clark Fork, Idaho turn right onto Stephen street for approx. 0.3 miles to South River Road. Turn left and take South River Road approx. 0.7 miles, turn right onto Johnson Creek Road for approx. 2.7 miles. Arrive at Johnson Creek Bridge project. *This project has been awarded and all trades have been let.

Award

Bridges / Tunnels

$800,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
32
Bidding Soon
329
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.