BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Russellville, Arkansas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The project includes the removal and replacement of concrete sidewalk and driveways, incidental curb and gutter, and new ADA ramps along West 11th Street, East J Street to North Greenwich Avenue to East K Place in Russellville, Arkansas as described in the plans and specifications. The successful bidder will agree to complete all work described in plans and specifications within 60 calendar days of the written Notice to Proceed. Failure to complete the work within specified time limits shall subject the contractor to liquidated damages for delay. The attention of bidders is called to the fact that Act 150 of 1965 (as amended), Arkansas Statutes, states that a Contractor must be licensed by the State Licensing Board for Contractors before he may undertake work when the cost thereof in Arkansas is Twenty Thousand Dollars ($20,000.00) or more. The City of Russellville encourages participation of small, minority, and woman owned business enterprises in the procurement of goods, services and construction, either as a general contractor or subcontractor. It is further requested that whenever possible, majority contractors who require sub-contractors seek qualified small, minority and woman owned businesses to partner with them. Proposals will be considered on the basis of cost, the bidder's financial responsibility, his equipment, and his past performance in completing similar work. The City of Russellville reserves the right to reject any or all bids, to waive any formalities, and to accept the proposal deemed to be for their best interest. RICHARD HARRIS, MAYOR RUSSELLVILLE, ARKANSAS *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Sidewalks / Parking Lot

$124,408.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
34
Bidding Soon
361
All Active Projects
147
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 31, 2022

August 1, 2022

img_map_placeholder

Multiple Locations, Russellville, AR


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.