BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a laboratory facility in Batavia, Illinois. Conceptual plans call for the renovation of a laboratory facility.

Fermi National Accelerator Lab (FNAL) is in the process of constructing a new accelerator, "PIP-II" [1]. This 800 foot long superconducting linear accelerator is already under construction, and will come online in 2029. PIP-II includes a dedicated cryogenic plant providing liquid and gaseous helium to components of the accelerator. The piping system which delivers the helium from the cryoplant to the accelerator is known as the Cryogenic Distribution System (CDS). This Request For Information (RFI) is intended to solicit information from potential vendors for the installation of the CDS within the PIP-II footprint. The CDS has four major components, shown in Figure 2, within the scope of this RFI: o The Distribution Valve Box (DVB) is located within the cryoplant building and serves as the interface between the cryoplant and the CDS. o The Intermediate Transferline (ITL) runs from the cryoplant building to the accelerator tunnel. This includes both a vacuum-insulated multi-circuit cold transferline and several single-wall warm piping runs. o The Tunnel Transferline (TTL) is the piping in the accelerator's underground tunnel and includes interfaces for the accelerator components. This includes a vacuum-insulated multi-circuit cold transfer line with 26 modules (25 Bayonet Cans + 1 Turnaround Can) and several single-wall warm piping runs. o The warm gas pipe headers within CDS scope, include primarily helium gas piping as well as short sections or air, water, and nitrogen piping. The final connections between the TTL and the accelerator components (known as cryomodules) are accomplished with removable U-tubes. Cryomodules and U-tubes are outside the scope of this RFI. The method of contractor selection has not been determined at this time.

Conceptual

Laboratories

$1,600,000.00

Public - Federal

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
398
Active Projects
178
Bidding Soon
3,238
All Active Projects
1,363
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 16, 2023

img_map_placeholder

Kirk Rd & Pine St, Batavia, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.