BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 30, 2022 at 8:00 PM

Updated October 24, 2023

Site work for a water / sewer project in Plainview, Texas. Completed plans call for site work for a water / sewer project.

Lower Running Water Draw FRS No. 4 is a single-purpose dam that was designed and constructed as a low hazard dam. LRWD4 was constructed in 1976 on Slaton Draw, a tributary of Running Water Draw, 5.4 miles west-northwest of Plainview, Hale Co., TX. The dam was originally constructed as a low hazard dam for the primary purposes of watershed protection and flood prevention. Since construction of the dam in 1976, residential and commercial structures, major highways, and utilities have been constructed downstream of the dam. As a result, a catastrophic failure of the dam would result in property and infrastructure damages and potential loss of life. As such, the dam has been reclassified by NRCS as a high hazard dam and is being rehabilitated to mitigate identified dam safety deficiencies associated with the dam's reclassification as a high hazard dam. The rehabilitated structure includes removing the existing principal spillway inlet and installing a new standard inlet tower with the crest elevation at the existing low-stage crest elevation and connecting to the existing conduit. Lowering the existing earthen auxiliary spillway crest elevation by 1.7 feet and re-grade the inlet and outlet channels. Installing a 340 feet wide roller compacted concrete auxiliary spillway over the existing embankment with the crest elevation 2.4 feet lower than the earthen auxiliary spillway. Lowering the top of dam crest elevation 0.1 feet, re-grade the upstream slope to original slope dimensions, and flatten the downstream slope to 3:1. The principal spillway will be structed by cut and cover, and consists of a standard inlet, 30-inch RCP conduit, outlet structure will empty into the RCC stilling basin, and filter collar for piping and seepage control around the conduit. The deadline to ask questions is 7/13/2022 4:00 PM CST NRCS-5/27/2022 Performance time for completion of this contract is 550 calendar days, holidays and weather days not included. Estimated magnitude of work is $5 - $7 million. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$7,763,992.00

Public - County

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
7
Bidding Soon
336
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 20, 2022

September 19, 2022

Project location map

To Be Determined, Plainview, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.