BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Bryan, Texas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Question Deadline 03/28/2024 at 5:00 PM CT Alexander Road Bridge Scour Repair: The project goal is to protect the bridge's structural integrity from scour and erosion damages caused by the flow of water. Project construction elements include: Temporary Traffic Control Erosion Control to include rock check dam, silt fence, and temporary dewatering if needed Earthwork to achieve design grades Abutment structures will be protected with slope paving and rip rap Concrete bridge approaches Hydromulch of disturbed areas Replacement of existing guard rails and bridge rails to meet TxDOT standards, addition of concrete mow strip at guardrailsh. Alternate includes concrete approach for length of upstream guardrail. The Contractor shall be responsible for following all provisions of Chapter 2258 of the Government Code relating to the payment of prevailing wages. The wage rates to be used are included in Exhibit A attached. A contractor or subcontractor wh violates this section shall pay to Brazos County $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the wage rates stipulated on Exhibit A. The County reserves the right to accept or reject in part or in whole, any proposals submitted, and to waive any technicalities for the best interest of the County. Brazos County reserves the right to reject any proposals that do not fully respond to each specified item. All proposers must submit, with proposal, a cashier's check or certified check for at least five percent (5%) of the total bid price, payable to the order of Brazos County or a Bid Bond in the same amount issued by a surety, acceptable to Brazos County, authorized to do business in the State of Texas, as a guarantee that the respondent will do the work described herein at the rates stated herein. Unsuccessful respondent's Cashier's Check or Certified Check will be returned after a written request to do so has been received by the Purchasing Agent. The successful respondent must provide to the Purchasing Department, a performance bond and a payment bond, each in the amount of 100% of the total contract sum within ten (10) calendar days after receipt of notification of RFP award. Such bonds shall be executed by a corporate surety duly authorized and admitted to do business in the State of Texas

Post-Bid

Roads / Highways

$200,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
320
Active Projects
201
Bidding Soon
4,590
All Active Projects
1,838
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.