BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Cincinnati, Ohio. Completed plans call for the renovation of a municipal facility.

The short-listed teaming firms advancing to Phase II of this solicitation are as follows: Nichols Contracting, Inc./Alphatec PC IAP Design-Build, LLC/Stantec Architecture, Inc.The General Services Administration (GSA) Design Excellence Program seeks to commission architects, engineers, and construction professionals to maintain and modernize our legacy federal buildings for the next 50 to 100 years of service. These projects are to demonstrate the value of integrated design that balances historic significance with current needs; balances aesthetics, cost, constructability, and reliability; and creates environmentally responsible and superior workplaces for civilian federal employees. In this context, GSA announces an opportunity for Design and Construction Excellence in public architecture for performance of Architectural Engineering Design and Construction services in accordance with GSA quality standards and requirements. As required by law, regulation or Executive Order, all facilities will meet performance targets and security requirements. The GSA intends to award a Design-Build (DB) contract for the modernization of the existing historic Potter Stewart U.S. Courthouse elevators located in Cincinnati, OH, pursuant to the Federal Acquisition Regulation (FAR) Two-Phase Design-Build Selection Procedures (FAR Subpart 36.3). The Potter Stewart U.S. Courthouse is a historic building, located on one city block between Walnut and Main Street on 5th Street in Cincinnati, Ohio. It is on the National Register of Historic Places. The courthouse is home to several court systems, judicial offices and government administrators. The eight passenger elevators were installed by Warner Elevator Company in 1937. They were renovated and modernized in 1992 by General Elevator Company. As part of the renovation the machine room control panels, car and hoistway door equipment, pushbuttons and wiring were replaced. Some of the equipment is original and has been in service for 70+ years. The elevator hoist machines and motor generator sets have exceeded their useful life and require replacement. The contract will be awarded for a firm fixed-price for the design-build services. This project will utilize the Design-Build (DB) delivery method, with the DB contract procured by competitive negotiation using a two-phase design-build selection procedure (FAR 36.2). A single DB contract will be issued for a revised design concept submission, Design Development Phase and Construction Documents Phase services, as well as all construction work and any/all required specialty construction work. For this contract award process, GSA will issue a Solicitation consisting of Phase I and Phase II, respectively. The purpose of Phase I (the request for qualifications) is to select the most highly qualified Offerors from Phase I to participate in Phase II (the request for proposals). At the conclusion of Phase I, GSA will invite the Short-Listed Offerors to submit Phase II proposals. Phase II proposals will require submission of technical and price proposals, which are evaluated separately in accordance with FAR Part 15. Potential Offerors are hereby placed on notice that GSA will publicly announce the names of the Phase I "short-list" on SAM.gov. Maximum number of short-listed Offerors: A maximum of three (3) Offerors will be selected to proceed to Phase II. At the conclusion of Phase II, GSA intends to award a contract to a single Offeror for all design and construction services. This contract will be a full and open procurement, available to both large and small business firms. As part of the Phase II proposal, large business Offerors will be required to submit an acceptable small business subcontracting plan in accordance with FAR Part 19.7. The Request for Qualifications will be issued electronically on or about September 12, 2022 at http://www.SAM.gov. A Pre-Proposal meeting will be held on or about September 21, 2022, at 1:00pm at the Potter Stewart U.S. Courthouse, in Cincinnati, OH. Prospective attendees are required to submit an RSVP form, which will be included in the solicitation package, to the GSA Contracting Officer, Anna Vanko, via e-mail at anna.vanko@gsa.gov. Call in reservations will not be accepted. This meeting is intended to review the scope of the project and the submittal requirements. Please note, if Hamilton County Ohio is listed as a High Transmission area for Covid-19 at the time of the PreProposal Conference, (status may be checked here: https://www.cdc.gov/coronavirus/2019-ncov/your-health/covid-by-county.html), masks will be required while inside the Potter Stewart U.S. Courthouse, and must be worn at all times. Masks must be provided by the attendee. Proposals are due no later than 2:00pm Eastern Time, on Tuesday, October 18, 2022. The Project This project is for the design and construction of modernized elevator systems, which have reached the end of their useful life, in the existing historic Potter Stewart U.S. Courthouse in Cincinnati, OH. The Potter Stewart U.S. Courthouse is a historic building, located on one city block between Walnut and Main Street on 5th Street in Cincinnati, Ohio. It is on the National Register of Historic Places. The courthouse is home to several court systems, judicial offices and government administrators. The building has completed two prospectus projects over the last 15 years, however many of the proposed elevator upgrades were deferred to the future after an evaluation in 2006. A concept design report which evaluated the condition of all the building elevators was completed in January 2006. The eight passenger elevators were installed by Warner Elevator Company in 1937. They were renovated and modernized in 1992 by General Elevator Company. As part of the renovation the machine room control panels, car and hoistway door equipment, pushbuttons and wiring were replaced. Some of the equipment is original and has been in service for 70 years. The elevator hoist machines, and motor generator sets have exceeded their useful life and require replacement. Motor generators have been considered obsolete in the elevator industry for over 20 years. The main service elevator was installed in an existing shaft and renovated by Armor Elevator Company in the 1970's and then renovated again in 1992 by General Elevator Company. The renovation included the machine room control panel, hoist machine, motor generator set, car and hoistway door equipment, pushbuttons, and wiring. Most of the original equipment has been upgraded or replaced. The elevator hoist machine and motor generator reached the end of their useful life in 2018. I.B. the Solicitation and Contract (1) This procurement is being conducted using the two phase selection process found in FAR 36.3. Qualification proposals will be evaluated in Phase One to determine which offerors will submit proposals for Phase Two. One contract will be awarded using competitive negotiation. In Phase 1, GSA will select a short list of the most highly qualified offerors and request that those offerors submit Phase 2 proposals. All responsible sources may submit a Phase 1 proposal. A maximum of 3 firms will be selected to submit Phase 2 proposals. Only those selected offerors are authorized to submit Phase 2 proposals. Those offerors not selected for participation in Phase 2 will be notified in accordance with FAR 15.503(a). In Phase 2, Offerors may submit a price proposal subject to the Project Labor Agreement (PLA) requirements set forth in the Phase 2 solicitation (a PLA proposal), a price proposal not subject to the PLA requirements set forth in the Phase 2 solicitation, or both. Any price proposal submitted in Phase 2 shall clearly identify whether it is subject to such PLA requirements. (2) This Solicitation sets forth requirements for Phase 1 qualifications proposals and the evaluation factors for Phase 2 proposals for a Contract to construct the Project. Proposals conforming to the Solicitation requirements will be evaluated in accordance with the Method of Award set forth herein. The Government will award the Contract to the selected Offeror, subject to the conditions set forth herein. Questions Regarding Phase 1 Submit all questions regarding the Phase 1 to the Contracting Officer on or before close of business on October 7, 2022. Any responses provided by GSA will be posted on the Governmentwide Point of Entry (GPE) as an Amendment to the Solicitation.Completed PPQs should be submitted directly to the Contracting Officer. Ensure correct phone numbers and email addresses are provided for the client point of contact. Offerors should follow-up with clients/references to ensure timely submission of questionnaires. All completed Past Performance Questionnaires shall be submitted via email to anna.vanko@gsa.gov prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Municipal

$10,000,000.00

Public - Federal

LEED Certification, Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
73
Bidding Soon
1,392
All Active Projects
528
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 25, 2022

June 26, 2023

img_map_placeholder

100 E 5th St, Cincinnati, OH


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.