BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 13, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a playground / park / athletic field in Taylorsville, Utah. Completed plans call for site work for a playground / park / athletic field.

As of 6/13/2022 no award has been made. A timeline for the award has not yet been established. Project start date, June 6, 2022. Finish date, July 15, 2022. Bidders must complete and submit (upload with the bid, by the bid deadline) the Bid Form, Bid Alternate Form and the Unit Price Form if provided with this bid. It is the exclusive right of GSD to choose any, all or none of any requested alternates. Terms and conditions are nonnegotiable. Any questions regarding terms and conditions are to be submitted prior to IFB due date. Attempts to take exception to any terms and conditions will render the bid nonresponsive. Any additional terms or conditions submitted by the bidder will be discarded, will not be considered and will not become a part of any contract that results from this IFB. GSD reserves the right to award to award to the next low bidder if for any reason the low bid is not responsive, is withdrawn, rejected, disqualified or the bidder fails to perform. A person with an outstanding tax lien in the state of Utah may not submit a quote, bid or offer. Granite School District will reject a bid if the bid is not responsive or the bid is submitted by a bidder who is not responsible. A bid that is not responsive includes a bid that: 1. is conditional; 2. attempts to modify the bid requirements; 3. contains additional terms or conditions; or 4. fails to conform with the requirements or specifications of the invitation for bids. A bid that is submitted by a bidder who is not responsible includes a bid where Granite School District concludes that the bidder or an employee, agent, or subcontractor of the bidder, at any tier, is unable to satisfactorily fulfill the bid requirements. Granite School District trash cans and dumpsters may not be used by the contractor or by sub-contractors without specific permission by Granite School District.

Post-Bid

Playgrounds / Parks / Athletic Fields

$200,000.00

Public - State/Provincial

Site Work

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
86
Bidding Soon
1,015
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2022

June 6, 2022

Project location map

5225 S Redwood Rd, Taylorsville, UT

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.