BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Park City, Utah. Working plans call for site work for a 311,720-square-foot road / highway.

Question Submission Close Date 6/3/2022 12:00 PM MDT This courtesy posting is an advertisement of a procurement opportunity for Snyderville Basin Special Recreation District, not the Division of Purchasing. Responses should be directed to the designated individual/office as designated in the solicitation document. The Division of Purchasing does not accept responses for courtesy postings. The contract award for this solicitation will not be posted on this website. Instead, you will need to contact the designated individual/office as identified in the solicitation document. This solicitation posting will be canceled/closed upon the closing date of this solicitation; however, a vendor's response will still be evaluated by Snyderville Basin Special Recreation Districtas described in the solicitation document. The Division of Purchasing is neither the issuing or conducting procurement unit for this solicitation, as such it is the vendor's responsibility to review the entire solicitation in order to comply with any requirements. Crack sealing: all cracks greater than ¼ inch are to be cleaned by high pressure air blasting or any other method that leaves the crack surfaces clean and dry, the cracks are to be filled using a hot pour crack sealant, work must be performed in a manner that leaves the sealant as flat as possible on the surface of the trail to allow for travel by skateboards and other recreational devices with small diameter wheels. All spilled and excess sealant must be removed from the surface. A plan to warn trail users and to close the trail section to trail users must be approved by The District and implemented before the crack seal is applied and kept in place until the crack seal has adequately cured. Seal Coating: For the asphalt trails and parking lots listed below: • Clean the trail/parking lot surface by sweeping and/or blowing the asphalt surface and/or power washing, or any combination of these processes that will clean the dust and debris and ensure bonding of the sealcoat. • Apply two coats of sealcoat following the manufacturer’s guidelines (product name and specs must be submitted with bid). The seal coat shall be applied when the ambient temperature is greater than 56° F and the trail surface temperature is greater than 60°F. • Spillage over the edge of the trails must be kept to two inches or less. • The work schedule of parking lot resurfacing shall be coordinated with the District so as not to conflict with events and peak periods. The parking lot seal coat shall be staged in a manner that leaves 50% of parking open for use at all times. • Copies of the Bills of Lading for the Seal Coat material must be supplied to Snyderville Basin Special Recreation Distri

Final Planning

Roads / Highways

$60,353.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
31
Bidding Soon
544
All Active Projects
255
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2022

December 29, 2022

img_map_placeholder

Multiple Locations, Park City, UT

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.