BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 17, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a mixed-use development in Warrior, Alabama. Completed plans call for site work for a sidewalk / parking lot; water / sewer project; and for paving for a sidewalk / parking lot.

All qualified bidders are invited to submit a Bid under sealed envelope to the City of Warrior for replacement and upgrades to an existing storm sewer system. The required work includes but is not limited to the replacement of curb inlet, the installation of approximately 450 lf of varying sizes of storm pipe, junction structures, stone backfill, full depth asphalt trench repair, concrete curb and gutters, and all necessary appurtenances to complete the work at Kemp Drive and 3rd Street, Warrior, Alabama, 35180.

Post-Bid

Sidewalks / Parking Lot

$700,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
54
Bidding Soon
778
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 16, 2022

July 15, 2022

Project location map

To Be Determined, Warrior, AL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.