BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 28, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a mixed-use development in Greenville, North Carolina. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

72215130,2017001.1 The project consists of furnishing all labor, materials, and equipment and performing all work required to satisfactorily complete the Infrastructure for Corporate Hangars 25 & 26 project. The work includes earthwork, erosion control, asphalt-paved driveways and parking areas, storm drainage structures and pipes, water and sewer utility lines and services, fencing, seeding, mulching, sodding, and incidental items. Each bid must be accompanied by a Bid Bond, a deposit of cash or by a certified check payable to Pitt County-City of Greenville Airport Authority, and drawn on some bank or trust company authorized to do business in the State of North Carolina, for an amount equal to 5% of the total base bid and bid alternatives, as a guarantee that if the bid is accepted, the required Contract will be executed and the required Performance Bond and Payment Bond furnished within fifteen (15) days after receipt of written notice of formal award of Contract. IMPORTANT NOTICE TO BIDDERS: Each bidder shall hold a NC General Contractor License and shall be prequalified by the NC Department of Transportation. Pitt County-City of Greenville Airport Authority hereby notifies all bidders that in regard to any contract entered into pursuant to this advertisement, that the bidder shall make good faith efforts to subcontract 2% (Combined Goal) of the dollar value of the prime contract for each project or schedule of work to Minority Business Enterprises (MBE) and Women Business Enterprises (WBE). Only firms certified as an MBE/WBE by the NCDOT Unified Certification Program may be applied to the goal. In the event that the bidder for this solicitation qualifies as a MBE/WBE, the contract goal shall be deemed to have been met. Individuals who are rebuttably presumed to be socially and economically disadvantaged include women, Black Americans, Hispanic Americans, Native Americans, Asian-Pacific Americans, and Asian-Indian Americans. The apparent successful competitor will be required to submit with the bid information concerning the MBEs that will participate in this contract. The information will include the name and address of each MBE/WBE, a description of the work to be performed by each named firm, and the dollar value of the contract. If the bidder fails to achieve the contract goal stated herein, it will be required to provide documentation demonstrating that it made good faith efforts in attempting to do so. A bid that fails to meet these requirements will be considered nonresponsive. It is the intent of Pitt County-City of Greenville Airport Authority to award the project to the lowest responsive bidder; however, the award of this contract is contingent upon the availability of State, and Local funds. Pitt County-City of Greenville Airport Authority reserves the right to reject any or all proposals.

Post-Bid

Transportation Terminals

$600,000.00

Public - City

Paving, Site Work

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
81
Bidding Soon
1,015
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 28, 2022

July 21, 2022

Project location map

400 Airport Rd, Greenville, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.