EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 27, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a water / sewer project in Milwaukee, Wisconsin. Completed plans call for site work for a water / sewer project.

Description COMBINED SEWER MAIN RELAY in: Located at: E. & W. Ring St. - N. Achilles St. to N. 2nd St. N. Achilles St. - E. Burleigh St. to E. Concordia Ave. E. Auer Ave. - N. Achilles St. to N. Bluhms Pl. This bid is your offer to perform or supply the subject matter decribed herein according to the terms and conditions set forth in this Invitation to Bid and Specific Official Notice, General Specifications, Detailed Specifications, Special Provisions, Plans, Project Information of this particular project, the proposed contract and Special Conditions when applicable. Your bid must meet the Detailed Specifications and the Plans for this particular project. You must agree to comply with all applicable requirements of the Americans with Disabilities Act of 1990, 42 U.S.C. Section 12101, et seq. The bid must be signed as set forth in the General Specifications and must comply with all the requirements therein set forth, or it will not be considered. If submitted by a corporation, the bid proposal must bear the corporate seal. Bid security hereinafter specified must be submitted with your bid. If a bid bond is used, it must be sealed by the bonding company and be accompanied by an affidavit of no interest and a copy of a power of attorney. Bonding agents must be licensed to do business in the State of Wisconsin. Bids received after the date and the time above specified will not be opened and read and will be deemed rejected. NOTE: Also read the General Official Notice to Contractors, General and Detailed Specifications, Special Provisions, and Special Conditions when applicable pertaining to this bid. Required pre-construction meetings will be held, at least ten (10) working days prior to the anticipated start date, for water main installation contracts. Contractor shall contact Mr. Anthony Fahres, P.E. at 414-286-8148 following the Notice to Proceed. Project start requests will not be authorized prior to holding a pre-construction meeting. Pre-Construction Meetings will be held at DPW Field Headquarters 3850 N 35th St Milwaukee, WI 53216 Schedule of Work - Contractor shall be required to prepare and bring to the Pre-Construction meeting a preliminary schedule of work for all projects in the contract.

Award

Water / Sewer

$854,231.00

Public - City

Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 10 - Specialties

Division 10 - Specialties

Storage Specialties, Postal Specialties
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Dewatering, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
87
Bidding Soon
1,501
All Active Projects
588
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 10, 2022

July 11, 2022

img_map_placeholder

Multiple Locations, Milwaukee, WI


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Combined Sewer Main Relay

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.