BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Fort Worth, Texas. Completed plans call for site work for a fire / police facility.

Fire Station Park scope of work includes: temporary fencing, erosion control, demo/ earthwork, fine grading, utilities, moisture conditioning, skatepark construction, site electrical, site concrete, site amenities, irrigation, landscaping, and turf establishments. Dean Construction reserves the right to reject any or all proposals, to waive technicalities, or to advertise for new proposals when in the best interest of The City of Fort Worth and Dean Construction. No bidder may withdraw its Proposal within ninety (90) calendar days after the actual date of the opening thereof. A bidder may bid on one (1) or more bid items on the same form. 20% MWBE Participation. Each bid item must be bid complete with no alterations, and must be accompanied by a qualification statement that demonstrates the bidder having successfully completed three (3) similar projects in the past five (5) years. Appropriate instruction and bidder experience are described elsewhere in the bound contract manual. Addendum #1 has been issued as of 6-6-2022. Attention is called to the fact that not less than minimum wages and salaries, based on the City of Fort Worth prevailing wage rates, must be paid on this project, and that the Contractor must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex or national origin. In case of ambiguity or lack of clarity in stating prices in the bid, Dean Construction and the City reserve the right to accept the most advantageous construction thereof to the City or to reject the bid. Contractor shall furnish maintenance bonds in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the Work described in the Contract Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Final Acceptance by the City

Under Construction

Playgrounds / Parks / Athletic Fields

$1,600,000.00

Public - City

Site Work

71

19

20

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
93
Bidding Soon
3,602
All Active Projects
1,415
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 16, 2022

August 8, 2022

img_map_placeholder

1616 Hemphill St, Fort Worth, TX

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.