BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a mixed-use development in Murrieta, California. Completed plans call for the renovation of a educational facility; and office development.

For Roof Replacement with WeatherWeld System 2022 This Project must be completed within 90 calendar days , herein referred to as Contract Time, as provided in the Bid and Contract Documents, herein referred to as Bid Documents. Prospective Bidders, herein referred to as CONTRACTOR, must review the Bid Documents for more complete information regarding this Project and submission of bids. Payment of Prevailing Wage Rates: Pursuant to California Labor Code section 1720 et seq., it shall be mandatory upon CONTRACTOR to whom the Contract is awarded, and upon any subcontractor under such CONTRACTOR, to pay not less than the general prevailing rate of per diem wages in the locality in which this work is to be performed for each craft or type of worker needed to execute the Contract, including holiday and overtime work as well as employer payments for health and welfare, pension, vacation, and similar purposes. Department of Industrial Relations: In accordance with Labor Code section 1725.5, CONTRACTOR and all subcontractors (of any tier) must be currently registered and qualified with the Department of Industrial Relations (DIR) in order to be listed on a bid proposal , awarded a public works project, and authorized to perform public work. Electronic Certified Payroll: Unless specifically exempted by the Labor Commissioner for this Project, CONTRACTOR and all subcontractors shall furnish certified payroll records as required pursuant Labor Code section 1776 directly to the Labor Commissioner in accordance with Labor Code section 1771.4, on at least a monthly basis, (or more frequently if required by SUPERINTENDENT or the Labor Commissioner), and in a format prescribed by the Labor Commissioner. These requirements will apply to all public works that are subject to the Labor Commissioner for this Project, monitoring and enforcement of the prevailing wage laws and related requirements will be performed by the Labor Commissioner/Department of Labor Standards Enforcement (DLSE). Bids shall be valid for sixty days after the bid opening date. Prior to award of the contract, the successful CONTRACTOR will be required to furnish a Performance Bond and a Payment Bond, each in the amount of one hundred percent (100%) of the Total Bid Price, on the forms provided, and in the manner described in the Bid Documents. All bonds must be issued by a California admitted surety as defined in the California Code of Civil Procedure 995.120. If applicable, CONTRACTOR shall comply with Public Contract Code 4108 with respect to subcontractor bond requirements. List of Subcontractors: Each CONTRACTOR shall submit with its bid, on the form furnished with the Bid Documents, a list of designated subcontractors on this Project as required by the Subletting and Subcontracting Fair Practices Act, and California Public Contract Code 4100 et seq. License Classification: Pursuant to Business and Professions Code 7028.15 and Public Contract Code 3300, CONTRACTOR shall possess the California contractor's license(s) classification C39, Weatherweld approved, Roofing Contractor . Subcontractors must possess the appropriate licenses for each specialty subcontracted. Each CONTRACTOR shall be a licensed CONTRACTOR pursuant to the Business and Professions Code and shall be licensed in the appropriate classification for the work to be performed. Failure to have the specified license or licenses shall render the bid non responsive and shall act as a bar to the award of the contract to any CONTRACTOR not possessing the specified license at the time of bid. Licenses acceptable for the work are intended in the bid package listed above, and more than one license may be required. The list in no way relieves CONTRACTOR from fulfillment of any legal requirement or licensing necessary for performance of his work. SUPERINTENDENT reserves the right to reject any and all bids, and to waive irregularities in any bid.

Under Construction

Office

$747,297.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
223
Active Projects
103
Bidding Soon
2,311
All Active Projects
1,041
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 16, 2022

July 18, 2022

img_map_placeholder

38670 Sky Canyon Dr, Murrieta, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.