BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in San Francisco, California. Completed plans call for the renovation of a municipal facility.

The objective of the project is to install impressed current cathodic protection system at 11 different locations for the existing Bay Division Pipelines Nos. 1, 2, 3 and 4 and the Palo Alto Pipeline at locations in Fremont, Newark, Redwood City, Mountain View, Los Altos, Palo Alto and Stanford. The work for each location includes the installation of AC power to the rectifier, 300-feet deep anode, excavation to expose the existing pipeline for the structure test lead connections, associated conduits and wirings, and restoration of the excavated areas to match existing. Bid discounts may be applied as per San Francisco Administrative Code Chapter 14B. The LBE Subcontracting Participation Requirement is 3.00% and ONLY San Francisco (Local) Small & Micro-LBEs can be utilized to meet this requirement (Firms certified by SF Contract Monitoring Division). SFPUC-LBEs cannot be utilized to meet the 3.00% LBE Subcontracting Participation Requirement.Attendance of remote attendees will be completed at the end of the pre-bid meeting. Bidders are required to have Class "A," "C-10," and "C-57" California Contractors Licenses in order to bid (Prime Contractor must have all three). Furthermore, each listed subcontractor must possess appropriate active licenses for the work each subcontractor will be performing.

Bid Results

Municipal

$3,274,440.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
342
Active Projects
160
Bidding Soon
3,234
All Active Projects
1,260
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 18, 2022

October 17, 2022

img_map_placeholder

Multiple Locations, San Francisco, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.