Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Hoover, Alabama. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
The City of Hoover hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, Disadvantaged Business Enterprises (DBEs) will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, gender, religion, age, disability, marital status or national origin in consideration for an award.No Bids will be accepted or opened after the date and time set forth herein.An original Bid Bond in an amount of not less than five percent (5%) of the total amount Bid (not to exceed $10,000) must accompany each proposal. The payee of such bond shall be The City of Hoover, Alabama. The bid Bond shall bear the same date as set for the receipt of Bids. The Bid Bond shall be signed by an agent authorized to do business in the State of Alabama. The entire project shall be completed in 90 calendar days. Questions regarding this bid should be directed, no later than June 15, 2022 at 5:00 pm., to Doug Peterson, PE with Gonzalez-Strength & Associates, at (205) 942-2486 or by email at dpeterson@gonzalez-strength.com. Answers to questions, clarifications, corrections, and additions to the Bid Specifications will be issued in the form of Addendums to the Specifications which will not be distributed by delivery or mail but, rather, shall only be posted on the city's website by 5:00 pm June 22, 2022. It shall be the responsibility of the bidder to frequently visit the city's website to view or download such Addendums, if any are issued. The Contractor whose Bid is selected must furnish a Performance Bond for one hundred percent (100%) of the Bid amount, and a Payment Bond for fifty (50%) of the Bid amount and must secure the bond from a bonding company's representative agent authorized and licensed to do business in the State of Alabama. Each bond shall be countersigned by an agent of the Surety having residence in the State of Alabama, and who is authorized and licensed to do business in the State of Alabama and each bond shall depict the complete address of said agent. The City reserves the right to reject any or all Bids, to waive any formality in any Bid, and to accept any Bid considered advantageous to the City. The City reserves the right to hold the Bids for a period of ninety (90) calendar days after the date of receipt of Bids. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.
Award
Roads / Highways
$302,208.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 29, 2022
July 29, 2022
Jaguar Dr, Hoover, AL
Related To This Project
Hoover, AL
Bid Date: Oct 08 2021
Hoover, AL
--
Hoover, AL
Bid Date: Jul 13 2022
Hoover, AL
Bid Date: Nov 03 2021
Hoover, AL
Bid Date: Mar 21 2022
Hoover, AL
--
Hoover, AL
--
Hoover, AL
--
Hoover, AL
Bid Date: Jul 07 2022
Hoover, AL
Bid Date: Jun 22 2022
Hoover, AL
Bid Date: Jun 22 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.