Remodeling of an educational facility in Joplin, Missouri. Completed plans call for the remodel of a educational facility.

Joplin Schools Invitation to Bid Joplin Schools is soliciting bids for purchase and installation of 5 split heating and AC systems at Duenweg FEMA shelter. Joplin Schools is soliciting bids for purchase and installation of 5 Split heating and AC systems at Duenweg FEMA shelter, 202 Malloy Circle, Duenweg, MO. This project shall include the purchase and installation of 5 split heating and AC systems, as defined in the attached Specifications and shall include all materials, labor and any other costs necessary to install; Connect gas supply from new units to existing building; provide proper high voltage installation; Contractor will work with TRANE to provide all low voltage wiring and installation of devices (see attachment); Contractor will work with TRANE for the startup cooling and heating operation; Add traps with cleanouts (see attached photo), thermostats as defined in the attached Specifications. Contractor will be responsible to install smoke duct detectors and coordinate tying into the existing alarm system, if applicable. Modification to existing prints, gas piping size is stated as 2" on the print and 1 /2" is sufficient to connect from the unit to the school. The new split systems will be connected to the existing Trane SC system (by TRANE) and controlled by the District Wide Trane Control system. All points shall be re-mapped and the system checked out. Please contact Trane Commercial Sales Office, Springfield Mo, Stewart Rogers for equipment I controls pricing srogers@trane.com 417 520 3322 / 417 343 3411 Installation per plans (attached) Remove existing hanging unit heaters to be retained by Joplin Schools Facilities department. The existing wall heaters will stay in place. Contractor will provide the concrete pad for the condensing units. The bidder understands and agrees the project may not commence before July 1, 2022 and must be completed within 60 days of receipt of equipment. Provide all labor and materials necessary to complete the scope of work. It will be the contractor's responsibility to work with TRANE to install new controls to communicate with the SC and AirFi communication to each new unit installed. It is the contractor's responsibility to field verify all site conditions and measurements. It will be the successful bidder's responsibility to provide sanitary conveniences. It is the successful bidder's responsibility to remove all debris and leave site clean of all construction debris upon completion of project. Bid Bond in the amount of 5% of the bid shall accompany the sealed proposal of each bidder. The successful bidder will be required to provide performance and payment bonds equal to the total value of the contract. Please direct any questions to: Dave Pettit, Facilities Director Joplin Schools 1301 Picher, Joplin. Mo. 64804 Phone: 417-625-5300 ext.2101 davepettit@jopl inschools.org Scope Of Work: This project shall include the purchase and installation of 5 split heating and AC systems, as defined in the attached Specifications and shall include all materials, labor and any other costs necessary to install; Connect gas supply from new units to existing building; provide proper high voltage installation; Contractor will work with TRANE to provide all low voltage wiring and installation of devices (see attachment); Contractor will work with TRANE for the startup cooling and heating operation; Add traps with cleanouts (see attached photo), thermostats as defined in the attached Specifications. Contractor will be responsible to install smoke duct detectors and coordinate tying into the existing alarm system, if applicable. Modification to existing prints, gas piping size is stated as 2" on the print and 1 14" is sufficient to connect from the unit to the school. The new split systems will be connected to the existing Trane SC system (by TRANE) and controlled by the District Wide Trane Control system. All points shall be re-mapped and the system checked out. Please contact Trane Commercial Sales Office, Springfield Mo, Stewart Rogers for equipment / controls pricing srogers@trane.com 417 520 3322 1417 343 3411 Installation per plans (attached) Remove existing hanging unit heaters to be retained by Joplin Schools Facilities department. The existing wall heaters will stay in place Contractor will provide the concrete pad for the condensing units.

Bid Results

Educational

$151,150.00

Public - City

Remodeling

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
22
Bidding Soon
517
All Active Projects
214
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 15, 2022

July 1, 2022

img_map_placeholder

202 Malloy Cir, Joplin, MO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.