BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 31, 2023 at 8:00 PM

Updated January 26, 2024

Demolition, site work, renovation and addition to a mixed-use development in Paris, Texas. Completed plans call for the renovation of a 1,897-square-foot, one-story above grade municipal facility; for the demolition of a restaurant; for site work for a restaurant; for the addition of a municipal facility; municipal facility; warehouse / distribution facility; warehouse / distribution facility; and municipal facility.

**As of May 30,2023, this project has not yet been awarded. A timeline for award has not yet been established.** The work to be executed as herein described and shown on the drawings entitled Transportation Office Renovation for Ark-Tex Council of Governments, Paris, Texas, consists of demolition of an existing restaurant and adding 6 offices, conference room, breakroom, storage, lockers and two restrooms, furnishing of all materials, labor, equipment and services necessary or reasonably incidental to complete the construction of the aforementioned project on a site shown and described on the drawings - Removal of asbestos containing material. -Renovating an existing restaurant into an office. Which includes 5 offices, a lobby/waiting room, a conference room, a copy/office, a breakroom, a storage, a locker room and two restrooms. Location- 1610 Clarksville St Paris, TX 75460 April 17th - Review bids and discussions with contractors April 27th - Board approval/contract awarded Questions regarding this project will be accepted until 5:00 PM, April 7, 2023, and submitted via email to Uriel Carrillo, uri@level5arch.com. Responses to questions will be provided no later than 5:00 PM, April 12, 2023. ALTERNATE NUMBER 1 The walk-in freezer at the rear of the building was demolished prior. The tile was not removed. Provide an alternative to remove existing tile. ALTERNATE NUMBER 2 Removal of existing roofing system and installation of a new standing seam metal roofing system.nExisting roofing system shall be hauled away and existing wood deck shall be evaluated for damages and potential replacement. The existing wood deck shall be replaced in areas that will not be sufficient for attachment of new metal roofing system. Wood deck replacement shall be alternate number 3 and costs shall be provided as a s.f. price for replacement. New metal roofing system shall be installed per specification section 076100 Metal Roofing. Underlayment shall be installed per specification section 076100. ALTERNATE NUMBER 3 Remove and replace existing wood decking with 7 ply 3/4 " tongue and groove wood decking fastened to existing wood trusses.

Bid Results

Municipal

$399,079.00

Public - State/Provincial

Addition, Demolition, Renovation, Site Work

30

17

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
213
Active Projects
122
Bidding Soon
2,023
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.