BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 29, 2022 at 8:00 PM

Updated January 26, 2024

Site work and paving for a sidewalk / parking lot in Milwaukee, Wisconsin. Working plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Per Owner, no bids received for this project. They will be using a private company for services. Tack and Patch: (Approximately 1308 sq. Ft.) • Thoroughly clean and tack existing asphalt. • Furnish and install 1.5” compacted thickness hot mix asphalt. • Excavate existing asphalt and haul material off site. • Furnish and install 1” to 2” of crushed aggregate base course, as needed, to maintain existing grades. • Fine grade, water and compact crushed aggregate base course. • Machine pave a total asphalt thickness of 4” constructed in two lifts, with the first lift consisting of paving 2.5” compacted hot mix asphalt using Wl D.O.T. gradation #2 binder course materials, followed by an application of tack coat, and then pave the second lift of 1.5” compacted hot mix asphalt using Wl D.O.T. gradation #4 surface course material. Sealcoat Entire Site: • Two Coat Commercial Sealcoating Procedure • Thoroughly clean the pavement surface of all dirt, debris and vegetation, using truck mounted power sweepers or air blowers. Soil sterilant shall be applied as required. • Prime all petroleum stains with “Petro bond” (acrylic oil spot primer) bonding agent. Areas of excessive oil buildup will be burned, as required. • Major cracks, %” and wider will be filled with W.R. Meadows Hi Spec, ASTM3405 (Hi Spec 3405) Polymeric Joint Sealer. (Crack filling is not a substitution for the repair of “Alligator” or “Spider Web” failure areas.) • Apply two coats of commercial grade asphalt emulsion, (Pave Shield, Armguard, Seal master), that provides a high-performance protective coating for sealing asphalt pavement. Approved silica sand shall be added to the sealer at a rate of 6-7 pounds per gallon to enhance skid resistance and coating durability. • Re-stripe the existing parking lot layout.

Final Planning

Sidewalks / Parking Lot

$300,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
323
Active Projects
112
Bidding Soon
1,937
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 10, 2022

August 1, 2022

Project location map

1350 E Locust St, Milwaukee, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.