Renovation of a municipal facility in Greeley, Colorado. Completed plans call for the renovation of a one-story above grade municipal facility.

Weld County is requesting the cabling of the Weld County Range Facility and the demolition of legacy cabling. The project includes a total of 64 category 6 cables from a single data closets to specific locations on the same floor of the single-story building. All associated patch panels and pathways are to be verified and provided by the contractor. Two 19' rack are required in this bid with associated ladder rack to the surrounding walls. 3 vertical cable management for the racks are required. The patch panels and all other data closet equipment as specified is required. Specific details will be provided during the mandatory walk-through. The project is considered an all-inclusive cabling turnkey solution. Building electrical diagrams will not be provided as part of this initial solicitation but will be provided at a later time. The final solution will be a one to one design with a switch placed under the newly installed patch panels. Patch cables at the specified amount in the details section are required prior to signoff. Jack labeling per Weld County requirements and test results required prior to signoff. All modular RJ's to fully populate a patch panel must be supplied, meaning if a jack is not punched down, the patch panel should not be left empty, and a RJ should be placed in all slots. Contractors are to furnish all labor, equipment, supplies, and material as necessary for the copper, data closet and all other components of the installation project. The project is to include the installation of specified cabling per the identified materials in the specification sheet. The installation will use industry standards in addition to requirements listed in this bid. Access into county facilities will be granted via escort and facility sign in will be required. All cabling test results, and as-built engineering documents are to be provided in both physical hard copy and electronically 30 days from project completion. There shall be a warranty for all materials and labor for a period of not less than one full year after the work has been accepted by the County. This in no way limits or reduces the warranty offered by any manufacturer of material or equipment used in maintenance or repairs. Full completion of the project needs to be no later than August 15, 2022. Copper Cable and Pathway Requirements: (QTY 64 cables requested) Modular patch panels itemized in specification section for all cables are required. CommScope 7504 Cat 6 Blue Cable All terminations must be tested to 250 MHZ and test sheets must be bound and given to technical services for future reference. All test documentation shall be delivered in hard and soft copy. Test documentation will include build out floor plan and cable test results. All testing must be done with company owned equipment and Corning certified for fiber. Copper cable locations and other requirements will be handed out at the mandatory pre-bid meeting. All cable runs will be home run from the distribution frame to each work area. Bridge taps and splices are not permitted as part of the horizontal cabling. Grounded cabling is not required .90 Meter maximum horizontal cable length. Provide neat cable management in the computer room. Commscope High Density Modular Patch Panels P/N 1375292 (2U-48) will be utilized for Data Closet Terminations Commscope SL110 Series Modular Jack to be utilize in conjunction with the Patch Panel for Data Closet Termination. All patch panel Jacks must be left populated even if a cable is not terminated. All ports in all installed patch panels must have a modular jack installed. All patch panels and cables must be labelled. All cables must be pulled to their final location. If conduits or cut outs are not supplied, or furniture mounting is required, the completion of the cable pull must be completed as requested. Provide support for cabling throughout the facility via J-hooks/Arlington loops or other similar means. Assure a ANNSI code and other code requirements are met. Assure all pathways are properly sleeved. Pathways and/core drills may be required and should be included as part of the requirements of the project. Data Closet and Rack Requirements: Provide appropriate and required equipment for cable bend radius when water falling into the rack. Provide fire caulking in all required locations. Provide appropriate support. General Requirements - Insurance Required - Local Service Required - Warranty Information Required Award Requirements - All or None Award

Post-Bid

Municipal

$25,000.00

Public - County

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
200
Active Projects
108
Bidding Soon
1,554
All Active Projects
649
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 8, 2022

July 8, 2022

August 15, 2022

img_map_placeholder

1401 N 17th Ave, Greeley, CO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.