BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 28, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a water / sewer project in Effingham, Illinois. Completed plans call for site work for a water / sewer project.

The project shall consist of material, labor, and equipment to construct a drainage carrier pipe varying in size from 12 inches up to 16 inches. The project will involve a directional bore with 24 inch casing pipe under the highway. It will also include restoration of the surface to as good or better than previous conditions. Proposals must be submitted to the City Engineer's Office, and shall be enclosed in a separate and sealed envelope endorsed "Boos Detention Basin Outtall". Each proposal shall contain the name of every person or firm interested in the same and shall be accompanied by a bid bond, bank cashier's check, bank draft or certified check for not less than five (5) percent of the amount of the bid. A surety bond for the full amount of the award is required. Failure on the paii of the contractor to deliver the materials within the time specified or to do the work as specified herein will be considered just cause to forfeit the surety as provided in Article 108.10 of the State of Illinois Standard Specifications for Road and Bridge Construction, adopted January 1, 2022. The City of Effingham reserves the right to reject any or all bids, waive or not waive any informality in the bids, and to accept any bid which it deems most favorable to the City. It is agreed that this bid may not be withdrawn for a period of 45 days from opening thereof or it will be subject to forfeit the 5% Bid Bond provided with the bid. It is anticipated that a Notice of Award of a contract will be issued within 30-to-45 days of the date bids are received and that a Notice to Proceed will be issued within 10 days of the date of the Notice of Award if contractor provides proper insurance and bonding in a timely manner. Work on this project is subject to the Illinois Wages of Employees on Public Works Act (820 ILCS 130/1-12). Contractor shall not pay less than prevailing wages to all laborers, workman, and mechanics or any other trade performing work under this contract, and shall comply with the requirements of the act stated above. The submission of monthly ce1iified payrolls to the City of Effingham will be required. Work on this project is subject to the Illinois Substance Abuse Prevention on Public Works Project Act as enacted by P.A. 95-0635.

Award

Water / Sewer

$370,062.00

Public - City

Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
50
Bidding Soon
793
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 14, 2022

July 14, 2022

Project location map

To Be Determined, Effingham, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.