BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 15, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a road / highway in Arcadia, Wisconsin. Completed plans call civil work for a road / highway.

The Town of Glencoe, Buffalo County, Wisconsin, is accepting 3 separate bids for Sealcoating the following (3) three roads: 1.) Ziegeweid Valley Road (STH 95 to end of Pavement) is 1.75 miles; 20 ft. in width. Double Chipseal with Dark Granit chips. 2.) Konkel Valley Road (CTH C to North Town Line) is 2.11 miles with 18-ft. width; Double Chipseal with Dark Granit chips. 3.) Boland Valley Road (STH 95 to the beginning of Dark Chipseal) is 1.3 miles; 20 ft. in width. Double Chipseal with Dark Granit chips. The Town of Glencoe reserves the right to accept or reject any or all bids or any part thereof.

Award

Roads / Highways

$200,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
64
Bidding Soon
552
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 10, 2022

August 1, 2022

Project location map

Boland Valley Rd, Arcadia, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.