Published September 15, 2022 at 8:00 PM

Updated October 1, 2024

Renovation of a water / sewer project in Millburn, New Jersey. Completed plans call for the renovation of a water / sewer project.

Check or Surety Company Bid Bond shall be made payable to the City of East Orange, NJ. The successful bidder will be required to furnish and deliver proposed goods/services in accordance with specifications and proposal cost. The Proposal Form shall also be accompanied by the following properly executed: Non-Collusion Affidavit; Affirmative Action Affidavit; Statement of Ownership; Bid Proposal Sheet; Business Registration Certificate; Disclosure of Investment Activities in Iran; Acknowledgement of Receipt of Change to Bidder Document; Public Works Contractor Registration Certificate; Statement of Bidders Qualifications; Qualification Affidavit; Acknowledgement and Statement of Organization; Certification of Bidder's Status...Debarred Contractors; Insurance Requirements; Construction Experience Record; Subcontractor Utilization Certification& Bid Document Submission Checklist. All bids must be presented in quadruplicate on the Proposal Forms provided and bids not on the Proposal Forms so provided may be rejected. Appropriately checked literature must accompany each copy of the Proposal Form. Bids will be accepted by mail or may be delivered or presented at the date and time set at the place herein listed above. Bids sent by mail must be received prior to the time set for receiving bids and should be brought to the Division of Procurement, First Floor, City Hall or mailed to: City of East Orange, DIVISION OF PROCUREMENT 44 City Hall Plaza East Orange, New Jersey 07018 Racquel C. Ferguson, QPA Bidders are required to comply with N.J.S.A. 34-11 56.25 regulating wages on Public Works, with the Equal Employment Opportunity Act, Requirements of N.J.S.A. 10:5-31 et seq. and N.J.A.C. 17:27 et seq. Affirmative Action and with the requirements of P.L. 1977 C33 regarding the submission of a list of all Stockholders or Partners owning more than 10% stock or interest in their Corporation or Partnership. The contract or subcontract is expected to be funded in part with funds from the New Jersey Department of Environmental Protection and the New Jersey Environmental Infrastructure Trust. Neither the State of New Jersey, the New Jersey Environmental Infrastructure Trust nor any of their departments, agencies, or employees is, or will be, a party to this contract or subcontract or any lower tier contract or subcontract. This contract or subcontract is subject to the provisions of N.J.A.C. 7:22-3, 4, 5, 9 and 10. The Successful Bidder must comply with all provisions of N.J.A.C. 7:22-9.1 et. seq. for the participation of small business enterprises owned and controlled by Socially and Economically Disadvantaged Individuals (SED's). During the performance of this Contract, the Contractor agrees to comply with the requirements of P.L. 1975, c. 127 (N.J.A.C. 17:27), all requirements of the State of New Jersey Worker Health and Safety Act (N.J.A.C. 12:110 et seq.) as amended and the United States Occupational Safety and Health Act (OSHA) (29 CFR 1910), as amended with regard to worker and jobsite safety. All advertisements for Bids shall be published in a legal newspaper sufficiently in advance of the date fixed for receiving the Bids to promote competitive bidding, but in no event less than 10 days prior to such date. The City Council reserves the right to reject any or all bids due to any defects or for not adhering to the Specifications or for any reason or to waive informalities and accept any bid that in its judgment will be in the best interest of the City of East Orange. The City Council reserves the right to sever and make awards of all or parts of any bids to one or more bidders.

Bid Results

Water / Sewer

$582,500.00

Public - City

Renovation

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 08 - Openings

Division 08 - Openings

Hardware, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Flooring, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Other Specialties, Flags and Banners, Flags
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures, Glazed Structures
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Identification for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Distribution Equipment, Wiring Devices, Facility Electrical Power Generating and Storing Equipment
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Rough Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Sodding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Gas and Vapor Process Piping
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Lifting Devices, Clamps, Manufacturing Equipment, Assembly and Testing Equipment, Applicators
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas and Liquid Purification Equipment, Gas and Liquid Purification Process Equipment, Chemical Feed Systems
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
565
Active Projects
332
Bidding Soon
5,193
All Active Projects
2,367
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 7, 2022

August 8, 2022

img_map_placeholder

300 Parsonage Hill Rd, Millburn, NJ

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

W.O.R.P.S. (White Oak Ridge Pumping Station) Disinfection System Conversion Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.