BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Hoffman Estates, Illinois. Completed plans call for site work for a playground / park / athletic field.

The Hoffman Estates Park District encourages minority business firms to submit on all Park District work and encourages all contractors working for the District to utilize minority business and sub-contractors and suppliers. Turf / Poured in Place Fall Surface Purchase and Install at Poplar Park. Location- 1901 Hassell Road Hoffman Estates, IL 6019 Construction Timeline: July 18, 2022 - August 15, 2022 Provide all labor, materials, equipment, and tools necessary for the complete installation of a synthetic grass playground safety surface system as outlined in these specifications. The vertical draining impact attenuating layer shall be suitable to meet safety standards for the fall height of the intended equipment. The system shall consist of, but not necessarily be limited to, the following: a) A complete synthetic grass system, consisting of a synthetic grass with a pile height of at least 1 1/8 inches long and not to exceed 1 3/8 inches long, 100% monofilament polyethylene fibers and polyethylene/polyester thatch layer, tufted on a 3/8" tufting machine with a minimum face weight of 55 ounces of yarn per square yard. The fibers shall include anti-static yarns, anti-bacterial additives and "cool grass" reflective pigments to reduce the surface temperature. Synthetic turf products utilizing nylon blades or nylon thatch layers will not be acceptable. The system should be infilled with between 1.5 to 2.0 pounds per square foot of acrylic coated sand (commonly known as T-Cool (R)) infill or a combination thereof as accepted by the managing architect. Systems utilizing granular rubber products made of recycled tires infilled in the grass blades will not be acceptable. The system shall include a single, dimensionally stable, two-component primary backing and have a minimum of 20 ounces of secondary polyurethane backing per square yard. The finished product shall also include perforations in a 2" by 2" pattern to ensure excellent surface drainage.

Bid Results

Playgrounds / Parks / Athletic Fields

$161,435.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
197
Active Projects
130
Bidding Soon
2,074
All Active Projects
886
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 7, 2022

July 18, 2022

img_map_placeholder

1901 Hassell Rd, Hoffman Estates, IL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.