BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 11, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a road / highway in Smith Center, Kansas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Site Directions: On US-281 Highway from the Smith Center south city limits north to the Kyle railroad tracks. The project consists of a 2 mill & asphalt overlay on US-281 Highway from the south city limits then north to the Kyle railroad tracks. Questions regarding bids shall be directed in writing to Josh Beckman at jbeckman@kirkham.com a minimum of two (2) calendar days prior to the date of the bid opening. A preconstruction conference will be scheduled at least two weeks in advance of the start of construction. The CONTRACTOR shall contact the City of Smith Center at 785-282-3812 and Kirkham Michael at 785-472-3163 to schedule the preconstruction conference.

Bid Results

Roads / Highways

$291,245.00

Public - City

Paving, Site Work

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
20
Bidding Soon
227
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 8, 2022

July 17, 2023

Project location map

US-281, Smith Center, KS


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.