BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Demolition and site work for a retail development in Moss Landing, California. Completed plans call for the demolition of a 5,540-square-foot retail development; and for site work for a retail development.

Demolition and removal of the entire 5,540 S.F. building that was formerly the Pot Stop and Little Baja pottery retail businesses, including the removal of the building extension at the rear of the building (utilized by Monterey Bay Kayaks).Demolition includes entire building except for concrete slab and foundations. The existing electrical panels are to remain, as shown in the drawings and existing trees and vegetation on site to remain. Existing stored pipe and other materials to remain. Remove and replace existing chain-link fencing around entire site perimeter. (Refer to plans for image of existing) The planned time frame for commencement and completion of construction of the Project is: 60 days from the start date specified in Owner's issuance of Notice to Proceed. Questions regarding the Project, the bid procedures or any of the Contract Documents must be submitted by email (NO PHONE CALLS PLEASE) to Tommy Razzeca. Final questions to be submitted in writing no later than five (5) business days prior to bid opening date and time. Responses shall be issued to all bidders no later than two (2) business days prior to bid opening date. The Bid Proposal must be accompanied by bid security of ten percent of the maximum bid amount, in the form of a cashier's or certified check made payable to Owner, or a bid bond executed by a-surety licensed to do business in the State of California on the Bid Bond form included with the Contract Documents. The bid security must guarantee that upon award of the bid, the bidder will execute the Contract and submit payment and performance bonds and insurance certificates as required by the Contract Documents within ten days after issuance of the notice of award. The successful bidder will be required to provide performance and payment bonds for 100% of the Contract Price. This Project is subject to the state and federal (Davis-Bacon) prevailing wage requirements applicable to the locality in which the Work is to be performed for each craft, classification or type of worker needed to perform the Work, including employer payments for health and welfare, pension, vacation, apprenticeship and similar purposes.

Award

Retail

$93,958.00

Public - Federal

Demolition, Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
44
Bidding Soon
1,119
All Active Projects
469
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 22, 2022

July 22, 2022

img_map_placeholder

2390 CA-1, Moss Landing, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.