BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 13, 2025 at 7:00 PM

Updated January 14, 2025

Site work, paving, new construction and renovation of a mixed-use development in Mayville, North Dakota. Working plans call for the renovation of a 55,900-square-foot educational facility; for site work for a road / highway; for paving for a road / highway; and for the construction of a 10,500-square-foot educational facility.

Plans call to complete a renovation, with some points of focus being the HVAC system, plumbing system, technology, data and communication systems, infrastructure and an update and seal for the building exterior. The project will also address ADA compliance, reconfigure the interior stairway access, repair foundation deterioration and address life safety concerns like adding an emergency notification system. Old Main's theater will also get a renovation of its own. Phase I Basic design and cost estimate: Building envelope and exterior renovation, soil and structural testing and design Basic Schematic pre-design of Old Main interior. Schematic plan for exterior renovation and landscaping. Cost estimates of the design plans. Conceptual artwork of the design plans. Relocation planning and design for temporary facilities for instruction and offices. Phase II Final Design and Construction Plan and bidding, Construction Full Design and construction documents for the Old Main renovation interior and exterior and landscaping. Full design and implementation of relocation plan. Development of plans and specifications to be used for the solicitation of bids as per North Dakota Century Code (NDCC) chapter 48-01.2. Preparation of all bid documents, including advertising and instructions to bidders, and oversight of the bidding process to ensure compliance with all requirements. As of January 13, 2025, this project in in the process of selection subcontractors. An architect and a general contractor have been selected. A firm timeline for construction has not been disclosed.

Pre-Construction/Negotiated

Educational

$52,000,000.00

Public - State/Provincial

New Construction, Paving, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
0
Bidding Soon
173
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 30, 2023

February 3, 2025

Project location map

330 3rd St NE, Mayville, ND


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.