Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a mixed-use development in Alton, New Hampshire. Completed plans call for the renovation of a educational facility.
Alton School District invites interested vendors to submit bids to automate the 3-4 wing classrooms, common area and Boiler Rm 5 controls during the summer of 2022 (July 1 - August 31) at the Alton Central School, 41 School Street, Alton NH 03809. Please contact the Facilities Director, Sean Asdot 603-875-7500 to answer any questions with the scope of the project. . Any communication regarding this RFP must be directed to: Heidi Duford Prospect Mountain High School 242 Suncook Valley Rd Alton, NH 03809 603-875-3800 x 3158 Fax 603-875-8028 hduford@pmsau.org General Specifications: The contractor will furnish Certificates of insurance naming Alton School District as an additionally insured entity to the Business Administrator within two (2) weeks of the award for services. During the term of the contract the Contractor shall maintain comprehensive general liability bodily injury in the amount of $1,000,000 for each person/each occurrence, subject to a $2,000,000 aggregate and property damage in the amount of $1,000,000. Finally, workers' compensation coverage as required by federal and state statute. The Alton School Board reserves the right to negotiate with the selected bidder to change the scope of work. The Alton School Board also reserves the right to negotiate with a bidder if all bids exceed the budgeted appropriation. Alton School Board reserves the right to waive any informality and accept or reject any, all or any part of a submitted quote and although price will be major factor in the District's award of the contract the District reserves the right to award the work to the party the Alton School Board determines is in the best interest of the District in the School Board's sole discretion. Any bid received after the time and date specified shall not be considered. Scope of work as follows: Disconnect and dispose of all existing standalone controls for the 8 zones. Install new DDC controls to better control the classrooms in the 3-4 wing and associated boiler room 5 and achieve better energy efficiency. Install and program control system for boiler room 5 including (1) new boiler room controller and one Grundfos pump. Install control system for the 8 zones/classrooms in the 3-4 wing including (8) unit controllers (8) new thermostats, and replace existing UV actuators to allow for total control of the heating operations. Connect the new controls back to the main control buss in the boiler room to allow for customer interface with the existing system. Test all operations of new controls and sequence of operations. This project must include a 1-year warranty on parts and labor. Add on. Install and program control system for boiler room 4 including (1) new boiler room controller and two Grundfos pumps. All controls to be an extension of the existing Reliable controls system.
Post-Bid
Educational
$36,310.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 10, 2022
July 11, 2022
41 School St, Alton, NH
Related To This Project
Alton, NH
Bid Date: May 29 2020
Alton, NH
Bid Date: May 11 2020
Alton, NH
Bid Date: Feb 22 2023
Alton, NH
Bid Date: Feb 22 2023
Alton, NH
Bid Date: Mar 16 2023
Alton, NH
Bid Date: May 31 2019
Alton, NH
Bid Date: Mar 15 2022
Alton, NH
Bid Date: May 27 2022
Alton, NH
Bid Date: Apr 30 2022
Alton, NH
Bid Date: May 27 2022
Alton, NH
Bid Date: Apr 12 2022
Alton, NH
Bid Date: Jan 05 2023
Alton, NH
Bid Date: Jan 03 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.