Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a civil project in Charlotte, North Carolina. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.
PC / Leeper Joint Venture is accepting applications for subcontractor prequalification for the Mallard Creek WRF Phase 1 Improvements Early Work Package 2. Electrical Description: In general the scope of work consists of the supply and installation of all electrical components for the new influent pump station for the MCWRF Phase 1 project. The work specifically includes but is not limited to, a new 14.8 MGD ADF influent pump station which has a new electrical and control room including 4000 Amp switchgear, VFDs, and electrical equipment. 2 new 3,000 KVA sized substations will be located adjacent to the pump station structure. Work includes construction in an active wastewater treatment facility and maintenance of operations will be required for this scope of work. Coordination will also be required with other packages for this pump station. HVAC/Plumbing Description: In general the scope of work consists of the supply and installation of the HVAC and plumbing components for the new influent pump station for the MCWRF Phase 1 project. The work specifically includes but not limited to new air handling units, new supply and exhaust fans, new ductwork, electric heaters, refrigerant and condensate piping, HVAC controls, hot water heaters, floor drains, domestic water piping, and sanitary sewer piping. Coordination will also be required with other packages for this pump station. Influent Pump Station & Yard Piping Description: In general this scope of work consists of construction of a new 14.8 MGD ADF raw sewer influent pump station. Work includes but is not limited to; support of excavation, excavation and backfill, concrete, masonry, misc. metals, waterproofing, painting, architectural finishes, process pipe and equipment installation (including installation of pre-purchased equipment). Work will be coordinated with other projects and packages on-site including the "Early Work Package #1" which provides initial site excavation and prep in this area. Mallard Creek WRF Phase 1 Improvements Influent Pump Station HVAC/Plumbing Mallard Creek WRF Phase 1 Improvements Influent Pump Station Electrical The Minority and Small Business Enterprise (M/SBE) Established Goal for this project has been set at 10%.
Post-Bid
Water / Sewer
$2,000,000.00
Public - City
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 1, 2022
August 30, 2022
12400 US-29, Charlotte, NC
Related To This Project
Charlotte, NC
--
Charlotte, NC
Bid Date: Jul 27 2022
Charlotte, NC
Bid Date: Aug 10 2022
Charlotte, NC
--
Charlotte, NC
Bid Date: Apr 01 2021
Charlotte, NC
Bid Date: Sep 01 2020
Charlotte, NC
Bid Date: Oct 29 2019
Charlotte, NC
Bid Date: Dec 20 2019
Charlotte, NC
Bid Date: Jul 27 2022
Charlotte, NC
Bid Date: Jun 28 2022
Charlotte, NC
--
Charlotte, NC
Bid Date: Aug 02 2022
Charlotte, NC
--
Charlotte, NC
Bid Date: Aug 16 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.