BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a bridge / tunnel in Woodbridge, New Jersey. Conceptual plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of October 8, 2024, an engineer has been selected for the project. A firm construction timeline has not been released. *The closed solicitation has been included below for reference: The scope of work encompasses field inspection and establishment of priorities for bridge rehabilitation, specifically the use of cementitious overlays, both composite and non-composite, deck replacement, and miscellaneous structural repairs on a multi-lane expressway facility. The primary work elements include: partial depth conventional demolition or hydrodemolition of the top surface of the existing deck, construction of a composite or non-composite overlay consisting of high density, impermeable, cementitious overlay, full depth conventional demolition of the deck with deck replacement, and miscellaneous structural repairs. The most recent biennial inspection reports and/or repair contracts for the list of bridges shall serve as the basis for establishing the scope of work for Contract No. T100.646. The Consultant shall prioritize recommendations to remain within the current construction budget of $70 Million. As part of the Phase A design submission, the Consultant shall submit an inventory of all areas of work which are deemed warranted for repair. From this inventory, the Consultant shall offer recommendations to address the highest priority repairs on each bridge while remaining within the construction budget. These recommendations shall be supported by narrative in the Phase A report which substantiates the rationale for excluding or including each repair type in the inventory of warranted repairs. For staged construction of deck overlay installation and deck reconstruction, temporary concrete construction barrier, Type 4 will be used. Layout and joint class is to be determined by the design consultant. Since the majority of the construction is in the travel lanes, traffic will frequently be shifted to the shoulders. The scope of work includes evaluating the shoulders with respect to pavement resurfacing, inlet reconstruction and guide rail standards. Traffic shifting is accomplished by means of obliteration of the existing striping and the use of temporary striping. Inquiries pertaining to this RFEOI are to be directed in writing to Sheri L. Malloy, P.E., via e-mail to malloy@njta.com. The deadline for inquiries is June 9, 2022. The Authority will respond to all written inquiries received. Each inquiry will be stated, and a written response provided. Responses will be posted on the Authority's website under Doing Business, Current Solicitations on or before June 13, 2022. The Method of Contractor Selection has not been determined at this Time.

Conceptual

Bridges / Tunnels

$70,000,000.00

Public - State/Provincial

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
468
Active Projects
182
Bidding Soon
4,497
All Active Projects
1,921
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2025

img_map_placeholder

To Be Determined, Woodbridge, NJ

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.