BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Beverly Hills, California. Working plans call for site work for a road / highway.

**As of August 12, 2022, this project has not yet been awarded. No definite date for the rebid.** Scope of Services Service include the removal and installation of parking meter poles in concrete, asphalt, and grass areas. The scope of the work is as follows: Section 1: Meter Pole Removal; Portland Cement Concrete 1.1- Portland Cement Concrete: : Remove (1) existing meter pole installed in Portland Cement Concrete (PCC) area, cutting along score lines in existing concrete surface (usually a 2 1/2 foot by 2 1/2 foot area), back filling with Crushed Miscellaneous Base (CMB), and replacing PCC as per spec BH 105 (bag mix is permissible). Include labor & materials. Provide pricing for service during regular business hours (M-F 8:00AM - 6:00PM) as well as nights and weekends. 1.2- Parkways, Planters, & Grass Areas: Remove (1) meter pole and concrete footing in grass area. Backfill footing hole with native soil and/or equivalent (to allow for growth of vegetation). Include labor and materials. Provide pricing for service during regular business hours (M-F 8:00AM - 6:00PM) as well as nights and weekends. Section 2: Meter Pole Installation 2.1 Meter post installation per Beverly Hills Standard Drawing BH 606 2.2 Portland Cement Concrete: Furnish and install (1) new galvanized steel meter mounting post set in 12" deep cored in concrete footings on sidewalk with base covers. Include labor & materials. Provide pricing for service during regular business hours (M-F 8:00AM - 6:00PM) as well as nights and weekends. 2.3 Parkways, Planters, & Grass Areas: Furnish and install (1) new galvanized steel meter mounting post set in 18" deep concrete footing in grass area. Include labor and materials. Provide pricing for service during regular business hours (M-F 8:00AM - 6:00PM) as well as nights and weekends. (Removal) Portland Cement Concrete (Removal) Parkways, Planters & Grass Areas (Installation) Per BH 606 (Installation) Portland Cement Concrete (Installation) Parkways, Planters & Grass Areas

Final Planning

Roads / Highways

$55,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
204
Active Projects
118
Bidding Soon
2,152
All Active Projects
987
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 27, 2022

February 12, 2023

img_map_placeholder

Multiple Locations, Beverly Hills, CA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.