BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in San Antonio, Texas. Design plans call for the renovation of a water / sewer project.

As of June 21, 2023, a design engineer has been selected. A bidding and construction timeline have not been confirmed. *The previous solicitation is listed below for reference The San Antonio Water System (SAWS) is pursuing a Request for Qualifications (RFQs) for professional engineering services for the Silver Mountain Pump Station Upgrades ("Project"). Statements of Qualifications (SOQs) from interested firms (Respondents) are being accepted in connection with the project, which will require the scope of services to be performed by qualified professional engineering firms (Consultants). The selected professional engineering firm shall provide engineering services entailing engineering evaluations, studies, reports, preliminary engineering, design, bid, construction, and overall project management services for the design and construction of the Project. The services will include, but not limited to, project management and coordination, civil, structural and electrical engineering services, instrumentation and controls, surveying, permitting, subsurface utility engineering, preliminary engineering and studies, design, scheduling, cost estimating, construction management and other services as necessary for the Project. June 14, 2022 by 4:00 PM (CDT). ............................................ Receipt of Written Questions Due June 17, 2022 by 4:00 PM (CDT). ..........................................................Q & A Posted to Website July 2022..............................................................................................................SOQs Evaluated July 2022..................................................................................................Interviews (If necessary) July/August 2022.......................................................................................... Contract Negotiations September 2022...............................................................SAWS Board Consideration and Award September 2022.............................................................................. Non-Selection Notices Mailed September 2022...................................................................................... Authorization to Proceed September 2022.............................................................................................................Start Work Respondents and/or their agents may contact Marisol V. Robles, SMWVB Program Manager at 210-233-3420 for assistance or clarification with issues specifically related to the Small, Minority, Woman, and Veteran-Owned Business (SMWVB) Program policy and/or completion of the Good Faith Effort Plan. Respondents are strongly encouraged to submit their proposals at least two (2) hours prior to the Proposal deadline and time to avoid last minute transmission issues. If you believe there is an issue, please contact July 8, 2022 by 10:00 a.m., Contract Administrator at 210-233-3070 for assistance before the due date deadline a. M/WBE Scoring Method: Up to 15 Points (By percentage) 40.00% M/WBE Participation o M/WBE Participation Percentage between 1% and 7.99%: 2 Points o M/WBE Participation Percentage between 8% and 14.99%: 4 Points o M/WBE Participation Percentage between 15% and 21.99%: 6 Points o M/WBE Participation Percentage between 22% and 28.99%: 8 Points o M/WBE Participation Percentage between 29% and 34.99%: 10 Points o M/WBE Participation Percentage between 35% and 39.99%: 12 Points o M/WBE Participation Percentage meeting or exceeding 40.00%: 15 Points b. SBE (Non-M/WBE) Scoring Method: Up to 5 Points (By percentage) 5.00% SBE Participation o SBE Participation Percentage between 1% and 1.99%: 1 Point o SBE Participation Percentage between 2% and 2.99%: 2 Points o SBE Participation Percentage between 3% and 3.99%: 3 Points o SBE Participation Percentage between 4% and 4.99%: 4 Points o SBE Participation Percentage meeting or exceeding 5.00%: 5 Points NTP Construction May 2024 Project complete May 2025 Cost Forecast Project Cost Center Cost Forecast Land Acquisition No Construction= $6,000,000 The method of contractor selection has not been determined at this time.

Design

Water / Sewer

$6,000,000.00

Public - City

Renovation

3

6

8

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
39
Bidding Soon
2,037
All Active Projects
755
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.