Published November 23, 2023 at 7:00 PM

Updated October 1, 2024

Site work and new construction of a military facility in Norfolk, Virginia. Completed plans call for the construction of a military facility; and for site work for a military facility.

Contract Award Date: Nov 22, 2023 Contract Award Number: N4005823D0035 Task/Delivery Order Number: N4008523F4133 Contractor Awarded Unique Entity ID: U8MKVGLBNC24 Contractor Awarded Name: JUSTIN J. REEVES, L.L.C. Contractor Awarded Address: Houma, LA 70364 USA Base and All Options Value (Total Contract Value): $6,611,168.22 All terms and conditions of N4008523D0030/0031/0032/0033/0034/0035/0036/0037 Indefinite Delivery Quantity Contract apply to this solicitation. Please review your MACC award document for guidance on contract clauses and requirements that may pertain to this order. All contract clauses in the Basic Contract by reference or full text remain in effect unless superseded by this task order. You are responsible to adhere to all applicable clauses, even if they are not stated in this RFP package or the Task Order award document. For clarification on any clause or other contractual issues, please contact Mary Ann Pool at mary.a.pool3.civ@us.navy.mil. Amendments will be posted directly to www.SAM.gov. NAVFAC Solicitation No.: N4008523R2541 NAVFAC Specification/Drawings: Work Order No. 1702359 (Attachment A) Title: P-1127U COMPOSITE SHOP Location of the Work: Naval Station Norfolk, Norfolk, VA Description of the Work: P1127U Constructs an intermediate maintenance level composite repair shop for the CMV-22B aircraft. Facility will consist of a reinforced concrete masonry unit (CMU) wall system with an exterior split-faced CMU veneer, concrete plie foundation, interior walls of CMU and a standingseam metal roof system. The facility includes shops, administrative space, paint mixing room, paint booth space, hazardous material storage, and other support areas. This facility shall be sized to accommodate the largest removable aircraft components anticipated to be repaired and will be located in close proximity to maintenance hangars and other Fleet Readiness Center (FRC) airframes shops. The largest, removable CMV-22B components include the rotor blades and cargo ramps. A minimum opening to accommodate both components will provide adequate access and maneuvering clearances for any CMV-22B component. Estimated Budget Amount for Design and Constuction: Approximately $3,870,000 Time for Completion: In accordance with FAR 52.211-10 Commencement, Prosecution, and Completion of Work, the duration of this task order shall be 515 calendar days from date of award (includes 15 calendar days for submission and approval of bonds and insurance). Wage Determination: Department of Labor (DoL) General Decision Number VA20230160 01/13/2023 applies to this work (Attachment B). The wage determination version in effect at the time of award shall apply to the work performed under this contract. Liquidated Damages: In accordance with FAR 52.211-12 Liquidated Damages, if the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $666.30 for each calendar day of delay until the work is completed or accepted. Bond Requirements: In accordance with FAR 52.228-1, Bid Guarantees, each Offeror shall submit with its offer a guarantee bond (Standard Form 24) in a penal sum equal to at least 20 percent of the offer price or $3,000,000, whichever is less. The Offeror shall submit an electronic copy with the price proposal form and a hard copy of your bid bond must be submitted to the address listed in the title above, within three (3) days after the due date and time for receipt of proposals. Failure to submit a bid bond by the deadline will result in your proposal being removed from consideration. Performance and Payment Bonds are required from the contract task order awardee ten (10) calendar days after date of award. Proposal Acceptance Period: Proposal acceptance period shall be 120 days from receipt of offers. Pre-Proposal Inquiries (PPIs): Offerors who determine that the technical and or contractual requirements of this RFP require clarification(s) in order to permit submittal of a responsive proposal shall submit all questions in writing. All inquiries shall be submitted via email to Mary Ann Pool at mary.a.pool3.civ@us.navy.mil no later than, fourteen (14) calendar days prior to proposal due date. Additionally, all inquiries shall be submitted using the Pre-Proposal Inquiry (PPI) form (Attachment C). Do not submit the same inquiry more than once. Please verify that inquiries submitted by you on behalf of your subcontractors are not duplicates. A response will be published via an amendment by email to MACC holders. Site Visit: TBD. Inforamtion will be provided in amendment. Proposal Due Date: Thursday, 24 August 2023 at 02:00PM EST. LATE PROPOSALS WILL NOT BE ACCEPTED. OFFERORS SHALL SUBMIT electronic proposals (.pdf format) in response to this solicitation using the PIEE Solicitation Module. Only the PIEE Solicitation Module is authorized for the submission of electronic proposals in response to this solicitation. Electronic proposal submissions should be no larger than 1.9 GB per file. Offerors shall ensure that the Government has received the electronic proposal prior to the date and time specified. PIEE Solicitation Vendor Access Instructions are provided via Attachment F. Emailed submissions will not be accepted. Offerors shall allow adequate time to upload files which may be slower for non-DoD users and to avoid other technical difficulties that may be encountered. Offerors are also responsible for submitting files in the format specified and consistent with requirements stated elsewhere in this solicitation. Files that cannot be opened, or are otherwise missing the required content are the responsibility of the Offeror. PIEE system will record the date and time of package submittal. The date and time of package submittal recorded in PIEE shall govern the timeliness of any proposal submission. LATE PROPOSALS WILL NOT BE CONSIDERED. In response to this request for proposal, the complete proposal shall include the Price Proposal and the Non-Cost/Price Factors Proposal, submitted in accordance with the above Basis of Evaluation and Submittal Requirements for Each Factor. Site Visit: All MACC holders are invited to attend Site Visit for the project. Please ensure you check amendment for confirmation of date and time: Date: Wednesday, 26 July 2023 at 9:00 a.m. EDT Meeting Location with Base Access: Please meet in Building SP-300, Conference RM 1 at 9AM EDT. Please note that parking is limited, as such, we recommend carpooling. Additional parking is available nearby but walking will be required.* *Please note that both P1127U and P1137U site visits will be held in conjuction with each other. Address: Building SP-300 FRCMA Det Norfolk 432 A street Norfolk, VA 23511 Meeting Location without Base Access: Meet at Pass & ID Office Building CD9, 45 minutes prior to the site visit. Address: Pass & ID Office, Bldg. CD9 9040 Hampton Blvd Norfolk, VA 23505 Site Visit POC: Lt. John Calderon, email: john.calderon.mil@us.navy.mil; Office: 757-444-5722/Cell: 757-325-5391 Badging: Contractor personnel that do not have DBIDS access for Naval Station Norfolk must complete both SECNAV 5512 form and ODP spreadsheet (ATTACHMENTS D and E) and submit to jacqueline.w.harris10.ctr@us.navy.mil. Complete block 25 of SECNAV 5512 with the following base sponsor information: Jackie Harris, 757-341-1826. DEADLINE TO SUBMIT BASE ACCESS FORMS IS 18 JULY 2023 BY 12PM EDT. This will be the ONLY Government scheduled site visit.

Award

Military

$6,611,168.00

Public - Federal

New Construction, Site Work

642

16

6

3

Subscribe For Documents

53 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Value Analysis, Administrative Requirements, Submittal Procedures, Certificates, Design Data, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Field Samples, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Temporary Construction, Vehicular Access and Parking, Traffic Control, Temporary Controls, Temporary Erosion and Sediment Control, Temporary Environmental Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Maintenance Data, Warranties, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Building Demolition, Site Remediation, Chemical Decontamination, Facility Remediation, Asbestos Remediation, Polychlorinate Biphenyl Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Post-Tensioned Concrete, Concrete Curing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Masonry Accessories, Unit Masonry, Clay Unit Masonry, Brick Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Steel Joist Framing, Metal Decking, Cold-Formed Metal Framing, Metal Support Assemblies, Metal Fabrications, Metal Railings, Decorative Metal
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Finish Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Thermal Insulation, Roof and Deck Insulation, Exterior Insulation and Finish Systems, Vapor Retarders, Steep Slope Roofing, Shingles and Shakes, Roof Tiles, Natural Roof Coverings, Roofing and Siding Panels, Metal Roof Panels, Membrane Roofing, Flashing and Sheet Metal, Sheet Metal Roofing, Fire and Smoke Protection, Firestopping, Joint Protection, Preformed Joint Seals, Compression Seals
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Wood Doors, Prefinished Wood Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Special Function Doors, Hangar Doors, Folding Doors and Grilles, Panel Doors, Sectional Doors, Entrances and Storefronts, Windows, Aluminum Windows, Wood Windows, Special Function Windows, Pass Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Plastic Glazing, Louvers and Vents, Louvers
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Lath, Gypsum Plastering, Gypsum Board, Tiling, Ceramic Tiling, Ceilings, Flooring, Masonry Flooring, Wood Flooring, Resilient Flooring, Terrazzo Flooring, Carpeting, Access Flooring, Wall Finishes, Wall Coverings, Painting and Coating, Painting, Exterior Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Demountable Partitions, Toilet, Bath, and Laundry Accessories, Storage Specialties, Lockers, Postal Specialties, Exterior Specialties, Exterior Protection, Protective Covers, Canopies, Flagpoles
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Vehicle Service Equipment, Parking Control Equipment, Commercial Equipment, Office Equipment, Computers, Foodservice Equipment, Educational and Scientific Equipment, Laboratory Equipment, Collection and Disposal Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Furnishings and Accessories, Portable Lamps, Lamps, Bedroom Furnishings, Blankets, Rugs and Mats, Furniture, Seating, Residential Furniture, Beds, Systems Furniture, Multiple Seating, Other Furnishings, Site Furnishings
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Fountains, Special Structures, Fabricated Engineered Structures, Metal Building Systems, Integrated Construction
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Escalators and Moving Walks, Lifts, Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Water Distribution, Plumbing Equipment, Domestic Water Filtration Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, Instrumentation and Control for HVAC, Instrumentation and Control Devices for HVAC, Direct-Digital Control System for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, Refrigerant Piping, Refrigerants, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Flexible Connectors, HVAC Fans, Air Outlets and Inlets, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Commissioning of Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Circuit Protective Devices, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Transfer Switches, Automatic Transfer Switches, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Data Communications, Voice Communications, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Geosynthetics for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Earthwork Methods, Soil Treatment, Termite Control, Soil Stabilization, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles, Caissons, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Fertilizing, Mowing, Pruning, Watering, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Concrete Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Retaining Walls, Planting, Planting Preparation, Mulching, Plants, Ground Covers, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Storm Drainage Utilities, Culverts, Fuel Distribution Utilities, Natural-Gas Distribution, Natural-Gas Piping, Hydronic and Steam Energy Utilities, Steam Energy Distribution, Underground Steam and Condensate Distribution Piping, Electrical Utilities, Utility Substations, Site Grounding, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Guideways/Railways, Monorails
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Hooks, Lifts, Manufacturing Equipment, Assembly and Testing Equipment, Applicators
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors, Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment, Packaged Water Treatment, Packaged Water Treatment Plants

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
48
Bidding Soon
773
All Active Projects
346
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 24, 2023

April 24, 2024

img_map_placeholder

1530 Gilbert St, Norfolk, VA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

RFP D/B - P-1127U Composite Shop

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.