BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 1, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a bridge / tunnel in Elkhorn, Wisconsin. Completed plans call for site work for a bridge / tunnel.

As of August 1, 2022, a timeline for construction has not been established. No further inquiries to be accepted. For 2022 roadwork - culverts only. For a list of complete specifications and bid forms, contact the Town Clerk-Treasurer or the Road Supervisor The Town Board reserves the right to accept or reject all bids or parts thereof, waive any informalities in the bidding process and to accept the bid proposal or portion of a bid proposal deemed most ad- vantageous to the Town. Barbara A Fischer WCMC, Clerk-Treasurer 262.723.4321 or townoflafayette@gmail.com Adam Brotz Road Supervisor 262.215.6205 A) POTTER ROAD #1 CULVERT REPLACEMENT: Approximately 2,500' east of intersection with Cobb Road o Sawcut road o Remove and replace 38' x 20" metal culvert o Bed, Backfill, and Compact with contractor supplied road gravel o Place Town supplied rip-rap at both ends o Contractor is responsible for disposal of any concrete, culverts, and spoils Check here if a subcontractor will be used______ B) POTTER ROAD #2 CULVERT REPLACEMENT: Approximately 2,600' east of intersection with Cobb Road o Sawcut road o Remove and replace 45' x 20" metal culvert o Bed, Backfill, and Compact with contractor supplied road gravel o Place Town supplied rip-rap at both ends o Contractor is responsible for disposal of any concrete, culverts, and spoils Check here if a subcontractor will be used______ C) POTTER ROAD #3 CULVERT REPLACEMENT: Approximately 4,400' east of intersection with Cobb Road o Sawcut road o Remove and replace 50' x 24" metal culvert o Bed, Backfill, and Compact with contractor supplied road gravel o Place Town supplied rip-rap at both ends o Contractor is responsible for disposal of any concrete, culverts, and spoils Check here if a subcontractor will be used______ D) SCOTCH BUSH ROAD CULVERT REPLACEMENT: East of Kulow Road o Sawcut road o Remove and replace 40' x 36" metal culvert and install new endwalls o Bed, Backfill, and Compact with contractor supplied road gravel o Place Town supplied rip-rap at both ends o Contractor is responsible for disposal of any concrete, culverts, and spoils o Town will supply all traffic control for closing the road $ Check here if a subcontractor will be used *This project has been awarded and all trades have been let.

Award

Bridges / Tunnels

$15,600.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
516
Active Projects
237
Bidding Soon
3,482
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 14, 2022

September 5, 2022

Project location map

Multiple Locations, Elkhorn, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.