Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published July 26, 2022 at 8:00 PM
Updated September 15, 2023
Site work and paving for a transportation facility in Moon Twp, Pennsylvania. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.
**As of July 26, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** The 8G1-22 Airfield Pavement Rehabilitation Project consists of pavement rehabilitation work on Runway 10R-28L and Taxiways F4, F5, W, and P within the runway safety area. The pavement rehabilitation activities include crack sealing, partial and full depth patching, spall repairs, and slab replacements. The Allegheny County Airport Authority will be receiving scanned PDF proposals through Submittable, and a submission link will be sent to each registered plan holder. Submittable recommends the following browsers: Microsoft Edge, Google Chrome, Mozilla Firefox, or Apple Safari. This project has DBE participation goals; DBE firms must be certified with the Pennsylvania Unified Certification Program) (PA UCP). Firms must be certified prior to award of contract. A searchable database of DBE firms can be found on the PA UCP portalThe Airport Authority reserves the right to reject any and all bids or waive any informalities in the bidding. No bidder may withdraw his bid for a period of sixty [60] days after the scheduled closing time for receipt of bids. MBE (4.8%), WBE (6.9%) Anticipated NTP Date: August 3, 2022 Estimated Completion Date: November 16, 2022 Work to be performed in this phase includes: o Install erosion and sediment control features o Install temporary construction safety items o Construct Concrete Repairs along Runway 10R-28L to limits shown on plans o Remove temporary construction safety items o Remove erosion and sediment control features ALTERNATE 1 Install erosion and sediment control features o Install temporary construction safety items o Construct concrete repairs along Runway 10R-28L, Taxiway F5, and Taxiway P to limits shown on plans o Remove temporary construction safety items o Remove erosion and sediment control features ALTERNATE 2 Install erosion and sediment control features o Install temporary construction safety items o Construct concrete repairs along Taxiway W to limits shown on plans o Remove temporary construction safety items o Remove erosion and sediment control features ALTERNATE 3 Install erosion and sediment control features o Install temporary construction safety items o Construct concrete repairs along Taxiway F4 to limits shown on plans o Remove temporary construction safety items o Remove erosion and sediment control features
Post-Bid
Transportation Terminals
$100,000.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 29, 2022
August 3, 2022
1000 Airport Blvd, Moon Twp, PA
Related To This Project
Moon Twp, PA
Bid Date: Sep 02 2022
Moon Twp, PA
--
Moon Twp, PA
--
Moon Twp, PA
Bid Date: Mar 02 2023
Moon Twp, PA
Bid Date: Mar 24 2023
Moon Twp, PA
Bid Date: Apr 04 2023
Moon Twp, PA
Bid Date: Mar 31 2023
Moon Twp, PA
Bid Date: Dec 21 2021
Moon Twp, PA
Bid Date: Sep 13 2022
Moon Twp, PA
Bid Date: Aug 15 2022
Moon Twp, PA
Bid Date: Sep 21 2022
Moon Twp, PA
Bid Date: Jul 27 2022
Moon Twp, PA
Bid Date: Sep 18 2019
Moon Twp, PA
Bid Date: Jun 15 2022
Moon Twp, PA
Bid Date: Jun 15 2022
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed