BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Arlington, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Furnishing the necessary labor, materials, equipment, tools, and guarantees thereof to perform the project. Work shall include: Schedule A: Work under this schedule includes replacing approximately 6,210 LF of new 12-inch, 10-inch, 8-inch, and 6-inch ductile iron water main and abandonment of existing asbestos concrete water main within Cemetery Road and adjoining side streets. Work will also include street restoration associated with the replacement of the existing water main and upgrades to existing water service connections and associated meters. Schedule B: Work under this schedule includes providing full-depth pavement replacement of various roads within the City of Arlington. Roadways include N Gifford Ave, N Lenore Ave, N Stillaguamish Ave, and N Washington Ave in the Old Town area. Work shall also include roadway channelization and minor improvements to existing sanitary sewer and stormwater structures. A Bid Deposit in an amount not less than five percent (5%) of the Total Bid Amount(s) stated in the Proposal. The City of Arlington expressly reserves the right to reject any and all bids, to waive minor irregularities or informalities, and to further make award of the project to the lowest responsible Bidder as it best serves the interest of the City of Arlington. No proposal may be withdrawn after the time stated above, or before Award of Contract, unless said award is delayed for a period exceeding sixty (60) calendar days after opening of the proposals, or Bidder withdraws proposal due to error in accordance with Section 1-03.1 of the WSDOT Standard Specifications. The Prevailing Wages in effect at time of Advertisement are provided in the Appendices.

Award

Water / Sewer

$2,919,092.00

Public - City

Paving, Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
202
Active Projects
98
Bidding Soon
2,955
All Active Projects
995
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 16, 2022

July 18, 2022

August 31, 2022

img_map_placeholder

Multiple Locations, Arlington, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.