BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a residential development in Mobile, Alabama. Completed plans call for the renovation of a residential development.

The City of Mobile's Department of Community and Housing Development (CHD) has opened the bidding process for 222 Norman St. If you have any questions, you can call Ginny Kirby at 251-208-6297. If you are a new Contractor and are interested in bidding with our program, please contact Ginny Kirby at 251-208-6297. All Contractors must submit the required documentation to be registered in our program before any jobs can be awarded. All work shall meet or exceed the requirements of the ICC Residential Code and the Standard Building Code (C) Section 1501 for roof materials, application, installation, ete. and Section 309 for roof and ceiling framing, and all other codes that govern. A building permit is required if there is any wood to be replaced. Pictures must be provided, through each step, to housing inspector during repair. Pictures must be clear, and referenced to home being worked on. Pictures are to be provided in real time, prior to home being completed. Areas that are found to be spaced decked shall be covered with 3" exterior grade sheathing material after removing the existing decking. It is the contractors responsibility to ensure the framing and structure will support the additional load. Remove existing roofing materials down to bare decking. o Check all roof trusses/rafters and repair/replace as needed to ensure that new roof structure is flat and smooth without rises or depressions in roof system. Replace all rotten, broken, un-even, weak, or deteriorated decking framing, fascia and etc. o Any exposed repaired or replace wood should be protected from the elements, painted to match existing color or white. Replaced/repaired decking shall be level and ready to accept felt and shingles. Check all roof trusses for strength and stability before re-shingling house. Remove all unused elements, vents, etc., that are not operational and close them below roof level. Re-flash all valleys, vents, roof openings, and chimneys. Install new boots around all roof penetrations. Haul away debris immediately. Use a magnetic sweep around the perimeter of house and rake away any other debris. o Cover entire roof decking with self-adhered roofing underlayment then install 15# asphalt impregnated felt underlayment Prepare roof decking to accept a ridge vent. Re-roof with a 30year dimensional class A fiberglass asphalt shingle. (Owners choice of color) (ANY AREA DEEMED TO NEED ROLL ROOFING MATERIAL WILL BE SELF ADHERING MODIFIED BITUMEN) CAP SHEET AND (BASE SHEET IF NEEDED) INSTALL PROPER METAL DRIP RAIL FOR THIS STYLE ROOF ING. o Shingles must be 1* quality still in the wrapper. Seconds will not be accepted. o Install drip rail around perimeter of house. Shingles shall have 4" to 1 4%" overhang. Install roof over ridge vent with-in 2ft of end of ridge (end to end) or wind turbines, (minimum of two) as appropriate.

Post-Bid

Residential Subdivision

$80,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
34
Bidding Soon
490
All Active Projects
229
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 17, 2022

July 18, 2022

img_map_placeholder

222 Norman St, Mobile, AL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.