Site work for a water / sewer project in Temecula, California. Completed plans call for site work for a water / sewer project.

The Work involves performing all work and furnishing all labor, materials, and equipment, as provided by the Contract Documents, for a completed Work of Improvement, as follows: This project requires the construction of recycled water pipeline extensions (and associated appurtenances) at four (4) distinct locales (please see Figures 1, 1A, 1B, 1C, and 1D in Appendix C). The locale labeled Figure 1A will require the construction of approximately eighty-five (85) lineal feet of eight (8) inch polyvinyl chloride (PVC) water distribution pipeline. The locale labeled Figure 1A will require the installation of a 6-inch underground blow-off and the installation of a 1 inch air vacuum & air release assembly. The locale labeled Figure 1A will require the installation of two (2) 2-inch copper tube irrigation laterals, along with an associated 2-inch meter for each lateral. The locale labeled Figure 1A will require the abandonment of two (2) 2-inch copper tube irrigation laterals, along with an associated 2-inch meter for each lateral. The locale labeled Figure 1B will require the construction of approximately seven hundred twenty-five (725) lineal feet of 12-inch polyvinyl chloride (PVC) water distribution pipeline. The locale labeled Figure 1B will require the installation of a 6-inch underground blow-off and the installation of a 1-inch air vacuum & air release assembly. The locale labeled Figure 1B will require the abandonment of a 1-inch air vacuum & air release assembly. The locale labeled Figure 1B will require the installation of a 2-inch copper tube irrigation lateral, along with an associated 2-inch meter. The locale labeled Figure 1B will require the abandonment of a 2-inch copper tube irrigation lateral, along with an associated 2-inch meter. The locale labeled Figure 1C will require the construction of approximately one thousand three hundred thirty (1,330) lineal feet of 8-inch polyvinyl chloride (PVC) water distribution pipeline. The locale labeled Figure 1C will require the construction of approximately one hundred fifty-five (155) lineal feet of 8-inch concrete mortar lined and & coated (CML&C) steel water distribution pipeline. The locale labeled Figure 1C will require the installation of two (2) 6-inch underground blow-offs and the installation of two (2) 1-inch air vacuum & air release assemblies. The locale labeled Figure 1C will require the installation of five (5) 2-inch copper tube irrigation laterals, along with an associated 2-inch meter for each lateral. The locale labeled Figure 1B will require the abandonment of five (5) 2-inch copper tube irrigation laterals, along with an associated 2 inch meter on each lateral. The locale labeled Figure 1D will require the construction of approximately two thousand thirty (2,030) lineal feet of 8-inch polyvinyl chloride (PVC) water distribution pipeline. The locale labeled Figure 1D will require the construction of approximately eighty-five (85) lineal feet of 8-inch concrete mortar lined and & coated (CML&C) steel water distribution pipeline. The locale labeled Figure 1D will require the installation of two (2) 1-inch air vacuum & air release assemblies. The locale labeled Figure 1D will require the installation of four (4) 2-inch copper tube irrigation laterals, along with an associated 2-inch meter for each lateral. The locale labeled Figure 1D will require the installation of a 4-inch polyvinyl chloride (PVC) irrigation lateral, along with an associated 3-inch meter. The locale labeled Figure 1D will require the abandonment of four (4) 2-inch copper tube irrigation laterals, along with an associated 2-inch meter on each lateral. The locale labeled Figure 1D will require the abandonment of a 3-inch polyvinyl chloride (PVC) irrigation lateral, along with an associated 3-inch meter. Online Q&A Yes Q&A Deadline 06/22/2022 4:00 PM (PDT) Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Start/Delivery Date Estimated NTP Friday, August 12, 2022 Project Duration 240 calendar days Bid Valid 60 calendar days Liquidated Damages $1,000 per calendar day License Requirements A or C-34

Award

Water / Sewer

$1,987,777.00

Public - City

Site Work

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
572
Active Projects
259
Bidding Soon
3,872
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2022

August 12, 2022

Project location map

Multiple Locations, Temecula, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.