Site work for a water / sewer project in Chesapeake, Virginia. Completed plans call for site work for a water / sewer project.

Onsite Sewage System Installation Project 2013 Centerville Turnpike S. Chesapeake, Virginia 23322 Scope of work: Cost for Line Item #1 (include total cost for items A-I) These are known factors. Vendors must invoice for actual cost incurred as described herein. A) Construct an onsite sewage system that meets the location and construction specifications of the Sewage Handling and Disposal Regulations (12VAC5-610-10 et seq. and 12VAC5-613-10 et seq., the Regulations), and all other applicable state and local laws, regulations, and ordinances. B) Construct the above onsite sewage disposal system in compliance with the Chesapeake Health Department (CHD) Construction Permit 234-22-048 at 2013 Centerville Turnpike S. Chesapeake, Virginia 23322 in the location shown on the permit. The permit contains additional conditions, notes, and information needed to construct the onsite sewage system. C) To prevent sewage from continuing to back up into the home or property surface while waiting for the septic work to start the contents of the existing septic tank shall be pumped by a properly licensed sewer hauler 14 days from signature of the Notice to Proceed and every 21 days thereafter until one week prior to the installation of the system. If the permit requires work within or under the existing drainfield (as indicated in the Permit) the contents of the existing septic tank shall be pumped out every 48 hours for one week prior to the installation or repair of the onsite sewage system in order to dry out the drainfield D) As necessary, provide or subcontract with a licensed plumber and electrician to provide plumbing and electrical required to convey the wastewater from the house to the onsite sewage system as required by the Regulations, and the Virginia Uniform Statewide Building Code (VUSBC). This includes obtaining or assuring that the owner obtains all permits and inspections as may be required by the local building authority in compliance with the VUSBC. E) Abandon any unused component of the former onsite sewage system as specified by the CHD Construction Permit 234-22-048.The existing septic tank shall be pumped by a properly licensed sewage hauler, the tank crushed in place, lime placed over the crushed tank, and the tank hole filled with clean backfill material. F) Obtain a final installation inspection from the system designer, Jason Fulbright, Onsite Soil Evaluator, and assure that the onsite sewage system complies with the Regulations. G) Provide all required documentation to the CHD following completion of construction and obtain an Operation Permit for the onsite sewage system. H) Follow all regulations and permitting pertaining to erosion and sediment control including stabilizing, seeding and grading the site after construction to return to the original state. Control construction runoff with proper practices so as not to become a nuisance to the owner or to neighboring properties or cause sediment to be discharged into state waters and drainage ditches. Any construction debris must also be removed from the site and disposed of properly. I) Bidders shall comply with all requirements of the Department of Professional and Occupational Regulations (DPOR) for contracting and executing the contract with the Virginia Department of Health. Must provide a copy of Class A, B, or C Contractors License from DPOR, Alternative Sewage Disposal System Contracting (ADS) specialty from DPOR, Master Alternative Onsite Sewage System Installer license from DPOR, proof of insurance. Bidders contacted by VDH to provide any missing required documents, must provide the document within 2 business days or their bid will be considered non-responsive. Additional Services (If Needed) Bidder must contact VDH Project Manager listed on the Notice to Proceed for approval prior to any additional services performed. VDH will issue a change order for actual additional services rendered. The contractor shall furnish all labor, supervision, equipment, tools, parts, supplies and materials, as necessary, to perform the services as described herein: A. Additional materials B. Additional labor and equipment. Breakdown of Total Cost When responding to solicitation Bidders must attach a document listing breakdown of total cost for line item 1. Bidders must attach a separate breakdown of cost for additional services. Additional cost should not be included in line item 1 bid submission. Additional questions: Contact Angelica Cipara via email: angelica.cipara@vdh.virginia.gov Notice to Proceed If Bidder is selected for award, the Bidder shall be required to provide a signed Notice to proceed form within 3 business days of notification. VDH will provide a form for signature. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Post-Bid

Water / Sewer

$50,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
45
Bidding Soon
681
All Active Projects
262
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 14, 2022

November 14, 2022

img_map_placeholder

2013 Centerville Turnpike S, Chesapeake, VA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.